Project Klemtu II Hydro British Columbia, Canada - Case Study
Courtesy of Dependable Turbines Ltd. (DTL)
Statistics:
Turbine: One 820mm double nozzle Pelton
Generator: One 1800kW WEG @ 900 RPM
Rated head: 310m
Rated flow: 0.66m3/sec
Commissioned: November 2009
This new facility replaces the existing 600kW power plant of which the generation equipment was also supplied by DTL (see Klemtu Village project in 1984). It provides increasingly demanded power to this growing village. A new penstock approximately 1000m long was installed and connected to the penstock of the 600kW plant, which draws water from Baron Lake. Via Internet connection, the status of this plant can be viewed using any Internet browsers.
In 2012, the Pelton turbine runner was repaired in our shop for a broken bucket and a number of worn and damaged buckets.
-