- Home
- Companies
- Biomass Engineering & Equipment (BE&E)
- News
- Trailer Loading for WDDGS at Ethanol ...
Trailer Loading for WDDGS at Ethanol Plants
Loading wet cake / WDDGS from the slab using a wheel loader is a time-consuming process that requires heavy investment. The process can frustrate truckers as they wait for an employee to arrive with the wheel loader. And when it’s done, there’s often a mess of wasted product.
The entire process is cumbersome and, considering the cost of a wheel loader, expensive.
Reduce your operational costs, clean up your operation, and reduce your reliance on hard-to-find labor by automating wet cake loadout with SMART Containers and a trailer loading station.
The SMART Containers utilize a push-pull stroker system that meters the output of wet cake into a SMART Conveyor, which feeds the trailer loading station. Trailers can simply pull in under the station, and an employee can switch on the wet cake loadout system with the push of a button.
-
Most popular related searches
Customer comments
No comments were found for Trailer Loading for WDDGS at Ethanol Plants. Be the first to comment!