Transformer Monitoring

Articles & Whitepapers

  • Experiences with the OECD 308 transformation test: A human pharmaceutical perspective

    Experiences with the OECD 308 transformation test: A human pharmaceutical perspective

    The OECD 308 water‐sediment transformation test has been routinely conducted in Phase II Tier A testing of the environmental risk assessment (ERA) for all human pharmaceutical marketing authorization applications in Europe since finalization of Environmental Medicines Agency (EMA) ERA guidance in June 2006. In addition to the ‘Ready Biodegradation’ test, it is the only transformation test for the ...

News

Equipment & Solutions

  • Effective Fiber Optic Hot Spot Monitor and Controller for Power Transformers
    Showcase

    Effective Fiber Optic Hot Spot Monitor and Controller for Power Transformers

    Advanced Energy`s Luxtron ThermAsset2 is designed to measure transformer winding hot spots in real time and activate control of the cooling system. Choice of two, four, six, or eight channels. Direct, accurate, and real-time transformer winding hot spot and temperature monitoring. Programmable setpoints and relays with individual LED alarm indicators.