n [ETA]MAX - Model 250KW - 1,5MW+ - Biogas Power Plants
From BTS Biogas Plants
Our technicians and experts have developed the most advanced system of biogas power plants, integrating different technology that allow you to achieve the absolute maximum efficiency. In the past, attention was focused mainly on electricity production. Instead, BTS Biogas has always considered it fundamental to optimise the entire enhancement process of delivered products and by-products: from incoming biomass cultivation and management to its fermentation, from thermal and electric power production to digestate use. There are four fundamental factors that determine the absolute yield of a biogas plant:
-
Most popular related searches
Products Details
- η - AGRONOMIC: optimising cultivation and material management in general, ideal ensiling and desiling; with BTS Biogas consulting, you can reach a 95% agronomic yield
- η - BIOLOGICAL: biomass pre-treatment (BIOaccelerator), ideal dosing, correct mixing times: with our METANmax program, fermenters reach maximum level yields
- η - ELECTRIC: with high methane content biogas, and choosing the most suitable and effi cient CHP unit, you can reach signifi cant increases in electricity yields
- η - THERMAL: the thermal power produced by the CHP units must also be evaluated; BTS offers various solutions such as, BIOdry and BIOpellett technology
Construction
- Biomass
- Clamp silo
- Conserved biomass
- Feedmixing vehicle
- Feeder
- BIOaccelerator (extruder, impact reactor)
- Roller chain conveyor
- Feed screw
- Agitator
- Heating rings
- Pumping house
- Control unit
- Desulphurization fan
- Post-fermente
- Gas cooler
- CHP
- Dryer
- Digestate
Customer reviews
No reviews were found for n [ETA]MAX - Model 250KW - 1,5MW+ - Biogas Power Plants. Be the first to review!