Set-up Procedures Services
Mobilization and demobilization along with site preparation costs will vary according to the region of remediation. The mobile design of the KM-4 and feed system, each on its own trailer, contributes to lower setup time and costs. Typical site set-up time is usually one day, allowing for fast and efficient start-up responses.
-
Most popular related searches
A Brief Description of the Site Set-up Involves:
A Brief Description of the Site Set-up Involves:
Position the control house and feed system. Bolt the feed hopper to the preheater, the stack for the air discharge, and the pugmill for the discharge soil. Connect the fuel lines that use either propane, natural gas, or #2 diesel fuel. Connect electrical power through cables on the main trailer hooked up to the control house which is supplied from the main grid power supply, or genset.