Gas Turbine Steam Generator - Greater Toronto Airports Authority, Ontario, Canada - Project
Sep. 16, 2021
Courtesy ofCambridge Pro Fab Inc. (CPF)
The Once Through Steam Generator installed at the Toronto Pearson Airport to make the airport self sustainable. This unit produces 75 MW of power, while the total airport consumption is 38 MW. CPF’s scope of supply included the filter house, silencer and baffles, project management and detail drawings.