Base Load Power Articles & Analysis: This-Month
2 articles found
Fortistar built, manages and operates the facility, where two (2) 57 MWe Taurus 60 gas turbine generator sets deliver 11.4 MWe of continuous base load power to the Duke Energy grid under a 20-year supply agreement. ...
Eight Flags Energy's combined heat and power (CHP) plant began generating electricity and steam in July of 2016. The location of the plant on Amelia Island is on the end of a lateral line so the plant provides excellent power quality and reliability. The project is a result of the partnership between Chesapeake Utilities Corporation, its subsidiary. Florida Public Utilities Company (FPU), and ...