Biogas Plant Project Articles & Analysis: Older
3 articles found
Location: Lünen Germany Plant Capacity: 70,000 t/a Fresh Substrate Realization: 2010 (Realized in 9 Month incl. Permit) Substrate: Energy Crops and plants Cow and Pig Slurry Different Manure Process: Single steps mesophilic process. Reception Silo and Tanks Full automatic Feeding System 2 Digesters (Total Volume 12.200m³) Storage ...
Location: Bardowick Lower Sacsonie Germany Plant Capacity: 36,500 t/a Fresh Substrate Realization: 2012-2013 Substrate: Food Waste from Super Market, Restaurants and Canteen, Food Industry Waste, Market Waste, Slaughter House Waste, ETP Sludge, Used Oil, Expired Food and brewery Process: 2 steps mesophilic process. Entire Capsuled plant with: Reception Areas for all Bin size , ...
The confirmation came to us through a Danish biogas plant manufacturer who took an interest in our technology, because he needs to include BioBANG in various projects of agricultural biogas plants fed to straw, which the company is starting to build in Poland. The manufacturer was invited to visit two BTS ...