Combustion Management Articles & Analysis
2 articles found
A no obligation survey was performed free of charge to determine how efficiently the plant was operating. A report was provided to the school outlining efficiency and emissions levels, highlighting where savings could be made and recommendations to achieve the savings. Based on the information collected during the survey, a quotation was prepared for the customer. This included the supply of 3 ...
Encasement of utility cables and pipes in flowable fill monoliths formed in trenches requires the use of materials that satisfy both strength and contaminant leachability limits. Coal combustion ash is often readily available for use in flowable fill construction. ...