Large-scale application
Courtesy of Hofstetter BV
Type HOFGAS®- Ready 2500 (2x)
Commissioning 2002
Client Cleanaway (Pitsea, GB)
Situation
The 2.8km2 big Pitsea landfill is located 50km east of London. It takes 2 to 3 years until the process of a landfill releases constantly gas. To compensate the initial unsteadiness, the 2 compact units with high temperature flares have been installed in two stages. A gas-to-energy project is in planning.
HOFSTETTER’s Task
- Conditioning of the gas for the combustion
- Complete, low emission combustion
- Adhering to EA regulations
- Automatic control of two flares simultaneously
- Readiness to utilise LFG in gensets atlater stag
HOFSTETTER’s Solution
Two HOFGAS®- Ready 2500 compact units were selected.
Specification
- Each flare with a max. gas flow rate of 2’500 Nm3/h
- Max. total burner capacity 25MW
- Regulation range 1 : 5
- Low emission combustion at 1'000..1’200°C
- Residence time min. 0.3 sec
- Plant control via PLC
- Automatic control of combustion temperature
Client’s Benefits
- Reduction of landfill gas emissions (proactive environmental protection)
- High temperature, low emission combustion
- Low operating costs
- Easy installation and commissioning
- Connection for generator sets
-