The project was conducted at Rivière-au-Renard in November 2016 on a 2.25 MVA power transformer installed on a 7’ x 7’ concrete base. This is an experimental wind turbine for the Gaspe Wind Farm Technical Centre (TechnoCentre Éolien de Gaspé). The collaboration of TechnoCentre Éolien staff was essential and greatly appreciated.