Project - Rural electrification using renewable energy solutions in the region of Sava

SHARE
Sep. 13, 2023
Courtesy ofArtelia Group

CLIENT
Agence de Développement de l’Electrification Rurale (ADER)

LOCATION
Region of Sava
Madagascar

DATE
2017 - 2021

ASSIGNMENTS

  • Technical assistance to the project management unit (“UGP”)
  • Checking of the studies performed
  • Detailed studies of power distribution networks
  • Updating of calls for tender
  • Assistance with the contract award process
  • Contract negotiation and preparation of the final contracts (FIDIC)
  • Monitoring and supervision of works implementation
  • Provisional and final acceptance procedures

Most popular related searches

This technical assistance forms part of a huge rural electrification programme implemented by ADER. In this precise case, SHER is assisting ADER with the implementation of three regional power distribution concession contracts in the region of Sava. The said projects must be performed in the framework of a public-private partnership (PPP). They concern 5 hydropower schemes with unit capacities ranging from 1 MW to 4 MW, for a total installed capacity of around 13 MW, as well as the associated transmission and distribution networks.

Hydropower schemes:

  • Ambalamaheva: 4 MW, 245 m, 2.5 m³/s
  • Belaoko Lokoho: 3.8 MW, 35 m, 15 m³/s
  • Antsahabe: 2.5 MW, 33 m, 10 m³/s
  • Ampamokiana: 2 MW, 14 m, 22 m³/s
  • Ankitsika: 1 MW, 175 m, 0.8 m³/s