Pioneering project with Wenger Engineering. Three GHS HyProvide™ A90 electrolysers to be deployed at an electrolyser test field in Bremerhaven, Germany.
Key Facts
3 x A-Series A90
Product
580
Production (kg/day)
28
Outlet pressure (bar)
Germany
Project location
Pioneering project in Germany
Three HyProvide™ A90 electrolysers with a combined capacity of ~1,3 MW for the production of green hydrogen from renewable electricity. Powered onsite by wind turbines, the HyProvide™ units will be deployed in a 20, and 40 ft container at an electrolyser test field in Bremerhaven, Germany.
The test fields’ purpose is to systematically compare effectiveness of Alkaline and PEM technologies. The electrolysers will also be connected to a virtual electricity network to determine what stabilising effects the connection of multiple decentralised generation units has on the grid.