As part of a larger infrastructure upgrade project at Royal Darwin Hospital, CCM Energy Solutions were elected by the primary contractor (O`Donnell Griffin) to supply two new Limpsfield high-efficiency burners for the two main John Thompson boilers which provide steam to the hospital. In addition, new Autoflame Mk7 combustion control systems were incorporated into the design, along with in-situ Autoflame exhaust gas analysis units for real time combustion analysis and combustion `trim`, and a data transfer unit to allow communication between the burner control systems and the hospital`s building management system (BMS). Variable speed drives (VSD) were also to be supplied for the control of the forced draft fan blower motors.