Wave energy converters are generally placed in a very harsh environment and are hard to access due to their location and/or unfavorable weather conditions. With this in mind a full-scale wind tunnel test facility capable of simulating a variety of wave heights and wave periods has been built to fully test and validate Aquanet's full-scale 1MW rated capacity Power Take-Off system (PTO). The unique 1st of its kind in the world test facility has enabled Aquanet to fully test and validate the system's performance and reliability in a variety of sea conditions, thereby de-risking the system before it is deployed at sea. Significant cost savings are achieved by commissioning and fine-tuning the PTO on land prior to its deployment at sea. The full-scale PTO is designed and equipped to demonstrate the system’s capability to generate real-time electricity.
The power take-off of a wave energy converter is defined as the mechanism with which the absorbed energy by the primary converter is transformed into useable electricity. The PTO system is of great importance as it affects not only directly how efficiently the absorbed wave power is converted into electricity, but also contributes to the mass, the size and the structural dynamics of the wave energy converter (WEC).
By having this direct influence on the wave energy converter, the PTO system has a direct impact on the Levelised Cost of Energy (LCoE). The PTO system has a direct effect on the efficiency of power conversion; hence, it has a direct impact on the annual energy production. The reliability of the PTO system affects the availability (the energy production) and the operation and maintenance cost.
Our PTO system has undergone step changes and modifications from the experience learnt through rigorous modelling, tank testing and validation in real ocean environment, particularly over the past 3 years. We have now built a robust and reliable commercial PTO system that requires very little maintenance throughout the 30 years life design of the system. The PTO system, designed to operate in all sea conditions, is now ready for onshore demonstration at full scale. It is 100% environmentally friendly, with no negative impact on marine life, no contaminants and zero emissions.
To ensure the cost-effectiveness of the WEC system, a control strategy is carefully designed for the PTO system to respond to the irregularity of each incoming wave by adjusting the stiffness and the damping of the PTO system. With a simplified design and highly efficient air turbine, the efficiency of the system is thereby increased and hence its cost-effectiveness.