Jurchen Technology GmbH services
Site Inspection and Module Replacement Services
The walking paths between the PEG blocks allows access to the DC plant. The location and width of the walking paths is determined during the project design and should consider the O&M requirements. A minimal width of the walking paths should be ~1m (3.3 feet) to allow comfortable access by the O&M personnel. The location and size of the cable trays should be considered as well. The module replacement could be done from the ground level, by reaching from underneath the array with a 12 volt drill or by removing all modules from the edge of the block up to the faulty module.
PEG - Solar Project Development Services
The PEG racking solution is extremely unique providing exceptional benefits for project developers in all development aspects: Far more flexibility with securing land. Far greater chances of community support. Far less council & environmental permit risks. Securing project investment.
