Obermeyer Hydro, Inc. products
Pneumatically Actuated Gates
Obermeyer Hydro - Hydropower Plant
Extra head, provided by Obermeyer gates, results in increased power production by maintaining maximum allowable pond elevations at all times. Although head can be increased temporarily by use of flashboards, our gates offer many advantages: The 1 to 3 foot margins typically required to cause failure of flashboards cause unnecessary upstream flooding under high flow conditions. Obermeyer Spillway Gates accurately maintain the optimum pond level for increased power generation while eliminating unnecessary upstream flooding.
Other Products
Obermeyer Hydro - Water Turbines
Obermeyer Hydro designs and manufactures patented gates and bulkheads that incorporate arrays of compact submersible turbine generator sets. These systems comprise complete hydropower plants that may be installed in existing water control structures without cofferdam construction, without excavation work nor associated geologic risk, and without expensive new concrete structures. Examples of structures well suited to economical hydropower development using Obermeyer Hydro`s technology include flood control reservoir outlet works and navigation locks and dams.
