P. Energy products
Turnkey Plant
P.Energy EARTH - Entry Level PV Module
It is the entry level PV module assembly line. It is completely manual and it is designed for a small production (1 MW in 1shift)
P.Energy - Model SATELLITE™ I - Entry Level Semi-automatic PV Module
P.Energy SATELLITE™ I is the entry level semi-automatic PV module assembling line. It is semiautomatic and it is designed for a small production (1 MW in 1 shift).
PV Equipment
P.Energy - Model LO072AR - Robotized Layup Station
The automatic layup station P.ENERGY LO072AR is a robotic system that takes the strings of cells from the Tabber&Stringer machines and places them correctly aligned onto the glass.
P.Energy - Model LT200A - In-Line Lighting Table
The station P.ENERGY LT200A is a lightning table that can be directly and automatically connected to the layout stations P.ENERGY L072 S and P.ENERGY L 072 AR.
P.Energy LAB-LAMINATOR - Model L036LAB - Automated Photovoltaic Module Laminator
LAB-LAMINATOR L036LAB is an automated photovoltaic module laminator. LAB-LAMINATOR L036LAB is the right solution for Schools, Universities, Laboratories, R&D Centres. It is the best laminator to encapsulate little laminates as standard modules made with plastic, glass or other material. It permits to laminate in standard mode using a standard cure EVA or using a fast cure EVA.
P.Energy - Model FURBA Series - Combined Tabber-Stringer Machines
The new Combined Tabber-Stringer machines of the FURBA series are the result of 15 years of constant development in the field of photovoltaic technology. The new CTS FURBA series is composed by: TS450FURBA, TS600FURBA, TS900FURBA, TS1200FURBA, TS1800FURBA.
P.Energy - Model GOLD Series - Laminators
The laminators GOLD series are two stages laminators 1st Stage vacuum stage and 2nd stage as curing stage. They can laminate 3 or 4 standard panels per cycle with fast cure EVA in 7,5 minutes. The max throughput is 24 or 32 panels/hour. VACUUM STAGE - This stage is provided with a pin lift system. The panels enter automatically in this stage and are lifted up during the vacuum time. After the vacuum they will lay down onto the hot plate.
