Cleaver-Brooks

CFC-E Installation - Manual

This manual covers installation of the CFC-E Boiler. Items covered include lifting and moving the boiler, placement of the boiler, boiler room requirements, connections, electrical requirements, and water treatment requirements. The information is presented to enable the installer to quickly install the unit with the least risk of damage to the equipment. Recommendations given in this manual are the minimum requirements. Insurance and local or state regulatory codes may contain additional or more stringent requirements than those stated in this manual. Installation must conform to the requirements of the owner`s insurance carrier, state/provincial and local codes governing such equipment, and/or any other authority having jurisdiction. Prior to installation, the proper authorities having jurisdiction are to be consulted, permits obtained by the installing contractor, etc.