Triangle Ltd
- Home
- Companies & Suppliers
- Triangle Ltd
- Downloads
- Prozinger Waste To Energy Brochure
Prozinger Waste To Energy Brochure
PlanET Biogastechnik GmbH Niederlassung Essen Girardetstraße 2-38 D-45131 Essen Telefon: +49 (0) 201 / 24 49 83-0 Telefax: +49 (0) 201 / 24 49 83-10 s.hoffmann@planet-biogas.com www.planet-biogas.com Commissioned: Commissioned: Commissioned: Commissioned: December 2008 Daily Input Daily Input Daily Input Daily Input ---- Residues and Biomass Residues and Biomass Residues and Biomass Residues and Biomass soap stock 13.7 t; vegetable fat 4 t pet food leftovers 2.7 t; cow manure 19.2 t; pig slurry 23.3 t; corn 11 t; dry manure 8.2 t ? Annual Biogas Production 6,2 Mio. NmAnnual Biogas Production 6,2 Mio. NmAnnual Biogas Production 6,2 Mio. NmAnnual Biogas Production 6,2 Mio. Nm3333 Technical DataTechnical DataTechnical DataTechnical Data In order to collect the incoming liquids, 4 co-fermentation tanks are part of this plant concept. Two of them are heated to keep the substrates pump-able. Additionally two hydrolysis tanks with 450 m3 per tank incl. heating and submersible mixer collect the manure. Moreover a PlanET Biogastech-nik solids charging system with 50 m3 capacity is installed. 2 Digesters with 2.660 m2 Digesters with 2.660 m2 Digesters with 2.660 m2 Digesters with 2.660 m3333 each each each each (height: 7 m) incl. wall and base heating, wooden roof, gas storage roof. Mixing system: Paddle giants & submersible mixer 1 Post Digester 1 Post Digester 1 Post Digester 1 Post Digester with 3.717 m 3.717 m 3.717 m 3.717 m3333 (height: 7 m) incl. wall and base heating, wooden roof, gas storage roof. Mixing system: Paddle giants & submersible mixer. 2 Digestate Storage Tanks 2 Digestate Storage Tanks 2 Digestate Storage Tanks 2 Digestate Storage Tanks with 3.690 m3.690 m3.690 m3.690 m3333 each 2222 CHP Units with CHP Units with CHP Units with CHP Units with 2 MWel installed capacity (Jenbacher gas engines) Technical HighlightsTechnical HighlightsTechnical HighlightsTechnical Highlights ? 2 hydrolysis tanks are installed for pre-treatment of the substrates ? A vacuum pumping system replaces the common pumping system ? Approx. 42 t of digestate are dried per day PROZINGER Waste To EnergyPROZINGER Waste To EnergyPROZINGER Waste To EnergyPROZINGER Waste To Energy NLNLNLNL----0593 Beilen0593 Beilen0593 Beilen0593 Beilen 124.0
Most popular related searches
