General Electric
  1. Companies & Suppliers
  2. General Electric
  3. Downloads
  4. TM2500+ Mobile Aeroderivative Gas ...

TM2500+ Mobile Aeroderivative Gas Turbine Brochure

GE Power & WaterDistributed PowerGE’s TM2500+ solution offers fast, mobile and ? exible powerPower whenever and wherever it’s neededGE Power & WaterDistributed PowerFocused on solving power challengespower potential on wheels accumulated hours of successful heritage operationfrom contract signing to commissioning from parking first trailer to commissioning full power production in less than 10 minutesMW MILLION HOURSMONTHDAYSMINUTES31 69~11110Currently, more than 1.3 billion people globally lack access to electricity. GE, whose technologies already help deliver a quarter of the world’s electricity, is working to bridge the gap through a portfolio of distributed power solutions. These technologies enable industrial businesses, developing communities and governments to meet their energy needs by positioning power at, or near, the point of use. The TM2500+ fast power solution from GE Power & Water‘s Distributed Power business enables governments, utilities, and businesses around the world to fulfill their generation require-ments within days. Thanks to their modular concept, fast installation features and quick production schedules, these units typically can be ready to enter into commercial operation approximately 30 days after your order is placed.The TM2500+ fast power solution harnesses the highly successful LM2500 aeroderivative gas turbine with more than 1,800 units deployed worldwide and almost 69 million hours of operation.Features of the TM2500+ fast power solutionBenefits of a TM2500+ solutionSpeedThe development of a new power plant could entail months of construction and commissioning. We can shorten that time from months to days under most conditions. Once on the ground, these mobile units can generate power in about 11 days. Reliability & availabilityDue to our aviation legacy with the LM2500+ gas turbine, GE‘s TM2500+ fast-power solution represents some of the most reliable distributed power units available. That means consumers will not face frequent interruptions and instabilities due to technical prob-lems related to faulty equipment or an unstable electricity grid. Dual fuel capabilityTM2500+ solutions are capable of running on both natural gas and/or diesel at an output of up to 31 MW with water injection for NOx abatement.MobilityMounted on a mobile, two-trailer assembly, TM2500+ generator sets can be transported via land, sea, and air to some of the most remote places in the world. Their mobile nature means that they can be swiftly deployed to other sites within days when they are no longer required at the original site.FlexibilityExtremely flexible, they have a sub 10-minute start cycle to full power.ScalabilityThe technology is also scalable, allowing you to buy the number of units you need with the option of adding more power quickly as demand increases.Gradual financingBecause large capital expenditure costs can be a barrier for some projects, these units can be purchased gradually for financing ease. In addition, they can be deployed where-ever demand exists without the need to invest in capital-intensive transmission and distribution infrastructure.Fuel flexibilityCan operate on gas and/or distillate liquid fuel Lower emissions50 percent lower emissions than diesel generators when operating on gasProven technologyMore than 1,800 LM2500 gas turbines deployed with 69 million operational hours of experienceEnhanced designTwo-trailer footprint for high power densityQuick lead timesOn-demand power plants delivered in weeks, not monthsScalable, reliable powerAble to add 31 MW blocks of power as demand increasesDistributed powerLocalized power supply, eliminating the need for additional transmission and generation infrastructureProject experienceMore than a decade of experience in providing emergency powerTurnkey designDelivery of complete energy solution GE Power & WaterDistributed PowerMultiple applications in a wide range of industriesThe TM2500+ solution can be deployed more than 6 times faster than other technologiesThe TM2500+ solution can solve a number of industry challenges. These include, but are not limited to, difficult access to the electric grid, an unstable grid, emergencies and natural disasters, rapid demand growth such as large construction projects, as well as escalating electricity prices and seasonal shortages. More details on applications of the TM2500+ mobile gas turbine generator are detailed below.The TM2500+ can be in commercial operation approximately 30 days after an order is placed, but these times may vary based on project location, site readiness, permitting process, and other variables.The Challenge Description Potential Industries TM2500+ as a solutionLimited or no access to the electric grid Cases with challenging access to the electric grid include: • Lack of robust transmission and distribution network • Delayed grid access • Remote, islanded and mobile operationsOil and GasMiningGeneral industryPower generationSpeed, Mobility, and ReliabilityCan deliver power where and whenit is needed and bring power online within 10 minutes to stabilize the gridRapid energy demand growthHigh and rapid demand for electricity in cases with restricted power availability such as new, large off-grid construction projectsGovernmentUtilitiesGeneral industrySpeed, Reliability Can fulfi ll power demand in the face of growing needs in a fast and reliable wayLengthy buildout of electricity generation infrastructureConstruction lead times on new generation facilities as well as unanticipated delays, meaning pressing electricity needs are not metGovernmentUtilitiesGeneral industrySpeed, Reliability Can bridge power until new facilities are completed and go onlineEscalating electricity pricesEscalating electricity rates during seasonal or peak periods requiring technologies that enable peak shavingGovernmentUtilitiesGeneral industryFuel ? exibility Can be used as a peak shaving application to help transition off the grid during seasonal or peak periodsNatural disaster & emergenciesCases of emergency where power generation sources are impacted and direly neededGovernmentUtilitiesSpeed, Mobility Can provide emergency power in a fast, reliable and mobile wayFlare gas Natural gas ? ared in oil fi elds leading to billions of dollars wasted and millions of tons of greenhouse gas emissionsOil and Gas Fuel ? exibility, Mobility Can help monetize gas ? aring for power generation and help reduce diesel consumption Customers may immediately generate incremental electricity revenue. $ millions in electricity revenue~ 1 MONTH ~ 6 MONTHS ~ 16 MONTHSTM2500+ mobile gas turbine Gas turbines Combined cycle$ millions in electricity revenueGE Power & WaterDistributed PowerCases in point - Solving our customers’ challenges480 MW* of on-demand power for Algeria23 MW* for peak shaving in 10 days for Greece Nyembo Ilunga, president, LS Energia AfricaAlgeria faces a drastic need for more power, particularly during the hot summer months when there is close to 10 percent annual growth in electricity demand.GE delivered 24 TM2500+ mobile gas turbine generators that provided more than 480 MW of power. The units were commissioned, delivered and operational in time to meet the northern districts of M’Sila and Fkirina’s 2013 summer peak electricity demand. After the seasonal peaks, some of the units were deployed to other cities in the south of the country to serve as permanent power.The Greek island of Rhodes is a prime tourist destination. During the summer months, an influx of more than 2 million people from all over the world swells demand for power to the breaking point.To avert blackouts, the island purchased a TM2500+ generator set, which was delivered before the summer season and commissioned within a few days of arrival onsite. This provided 23 MW of power generation in tandem with water injection to lower NOx levels to below 25 ppm.“GE‘s TM2500+ systems offer the right combination of efficiency and reliability needed to help the Angolan state utility, Empresa Nacional Electricidade-E.P. (ENE), reduce its fuel costs and increase the reliability of grid service in order to support continued economic growth in Angola.” 120 MW for bridging power for AngolaOnly 26 percent of Angola’s population of 19 million have access to power. Rich in natural resources, the country is engaged in a priority program to create a modern energy infrastructure.The government of Angola ordered five TM2500+ mobile gas turbine generator sets. 120 MW of onsite power is bridging the energy gap during ongoing plant construction, improving grid reliability and countering the rising cost of diesel fuel.*Power output is based in site conditions.GE Power & WaterDistributed PowerGE Power & WaterDistributed PowerCopyright © 2014 General Electric Company. All rights reserved.GEA-31187For more information on TM2500+ mobile gas turbines, visit us at www.ge-tm2500.com GE Distributed Power regional locations:TM2500+ General Arrangement Auxiliary TrailerPerformance you can count on for mobile PowerThe TM2500+ total solution and Services supportA TM2500+ fast-power solution project may include:• Installation• Commissioning• Project management• Decommissioning• Consumable parts kit (filters/ lubricants for operation needs)In addition, GE offers many services to support the ongoing operation and performance of the units including, but not limited to the following:• On-call technical advisory services• Maintenance planning and training• On-site hot section, combustor, and other modular exchanges• Depot Repair Services for scheduled overhauls and unscheduled repairs• Performance testingHouston, Texas, USA1333 West Loop South Ste 1000Houston, TX 77027, USAT +1 713 803 0900Nairobi, KenyaThe CourtyardGeneral Mathenge Drive WestlandsNairobi, KenyaT +25 4204215133Lima, PeruAv. Las Begonias 415, Piso 14San Isidro Lima 27, PeruTel. +51 1 514 4331Riyadh, Saudi Arabia5th Floor Tatweer TowersBuilding No. 3&4, King Fahad RoadRiyadh SA 11433, Saudi ArabiaT +966 11 207 3838Moscow, Russia27/8 Electrozavodskaya str.Moscow 107023, Russian FederationT +7 495 981 1313Shanghai, ChinaNo.1 Hua Tuo Rd.Zhang Jiang Hi-Tech ParkShanghai 201203, ChinaT +86 21 3877 7888Inlet FilterAssemblyTrailerGooseneckTransportationJeepInletPlenumGE LM2500+Gas TurbineBrush BDAX62-170ER GeneratorExhaust Stack HydraulicStarterFuel/WaterPumpsLube OilCoolersTurbine EnclosureFire SuppressionControl Room& Battery RoomSwitchgearTransportationStingerModel Water Injection(NOx = 25 ppmvd@15% O2)Output(MW)Heat Rate(Btu/kWh)Heat Rate(kJ/kWh)Efficiency(%)PressureRatioPower TurbineSpeed (RPM)Exhaust Flow(lb/sec)Exhaust Flow(kg/sec)ExhaustTemp (F)ExhaustTemp (C)60 HZTM2500+ None 30.688 8830 9316 39 22.5 3600 192.2 87.2 959.1 515TM2500+ Yes 30.988 9285 9796 37 22.8 3600 196.6 89.2 906.0 485.650 HZTM2500+ None 26.190 9246 9755 37 21.2 3000 184.5 83.7 925.0 496.1TM2500+ Yes 26.190 9705 10239 35 21.3 3000 187.2 84.9 879.0 470.6*The performance data shown above is at standard ISO (International Organization for Standardization) conditions. The ISO has defined the following standard conditions for comparing gas turbine engines Ambient air: 59°F/15°C, 60% RH; Barometric pressure (14.696 psia / 101.4 kPa); Sea level altitude. 60 Hz based on a Brush air-cooled generator w/brushless excitation @ 0.90 PF; 59°F/15°C cooling air; 13.8 kV (50 Hz @ 11.5 kV)
Most popular related searches

Contact supplier

Drop file here or browse