Andritz AG
  1. Companies
  2. Andritz AG
  3. News
  4. ANDRITZ to supply new power boiler for ...

ANDRITZ to supply new power boiler for the Pohang waste-to-energy plant, South Korea

SHARE
Jun. 30, 2015
Courtesy ofAndritz AG

International technology Group ANDRITZ has received an order from POSCO E&C to supply key equipment for a 50-megawatt bubbling fluidized bed boiler fired with refuse-derived fuel for the greenfield waste-to-energy plant in Pohang, South Korea. Start-up is scheduled for spring 2018.

The scope of supply also includes basic engineering as well as supervisory services for erection and commissioning. The plant will utilize 100,000 tons of pre-treated waste per year and generate power for 20,000 homes in South Korea, thus saving 85,000 tons of CO2 emissions every year.

Contact supplier

Drop file here or browse