The Bravo model is the smaller medium size predesigned boiler system in Focus BioEnergy standard program. There are only a small difference between a Bravo model boiler, and the larger Charlie.
-
Most popular related searches
Products Details
A power plant with a Bravo model, can supply steam, steam and electricity or heat and electricity ranging in 3 and 4 MW thermal energy output depending on the boiler size chosen.
With a pressure of up to 60 bar inside the boiler, the boiler works as accumulation of energy, that ensures a stable energy flow, despite fluctuation in the needs of the customer.
A power plant with a Bravo model boiler is a standard plant. The technical installation, such as boiler, grate, pumps, water treatment and etc. are all of the same type as used in our smaller Alpha model and our larger Charlie – and Delta model, only with minor difference.
The plant is always adapted to the operating modes requested by the customer. This means that there will be variation from plant to plant.
The building surrounding the entire installation is always adapted to the nearby building. Height of building and chimney, roads leading to the building and facility inside the building, will always be decided by the customer, adjusted to their wish and approved by local authorities.
Outside the building is also a storage for the biomass. Depending on the operation modes, and there for the output from the boiler, the capacity of the storage varies.
A Focus BioEnergy steam boiler plant is fired with biomass. There are many different types of biomass, useful for firing a steam boiler plant.
Biomass is:
- Wood chips
- Wood pellets
- Straw
- Straw pellets
- Energy crops
- Waste wood
- Olive stones
- Other agricultural waste.
The humidity of the biomass can be up to 55%
General Information
- Boiler output: 3 and 4 MW
- Design pressure: 60 bara
- Super heat temp.: Max 440° C
- Plant efficiency: 94%
- Biomass: Straw, wood pellets, wood chips, etc. (max. 55% water)
Steam and Power - CHP
- Boiler output: 4 MW
- Boiler pressure: 60 bara
- Electric production: 575 kW/h
- Steam production: 5.000 kg/h
- Condensate temp.: 90° C
High pressure inside the boiler is essential for overcoming fluctuations in steam demand from user
Steam
- Boiler output: 4 MW
- Boiler Pressure: 60 bara
- Steam production: 6.000 kg/h
- Condensate temp.: 90° Ca
High pressure inside the boiler is essential for overcoming fluctuations in steam demand from user