
MetalERG Sp. z o.o. Sp.k
- Home
- Companies
- MetalERG Sp. z o.o. Sp.k
- Products
- Ekopal - Model RM Series - Container ...

Ekopal - Model RM Series - Container Construction Biomass Boilers
It is also possible to make EKOPAL RM boilers in the so-called. Container development. An undoubted advantage of this type of solution is the need to build an additional boiler room (no building permit required). The unit is stand-alone and does not require constant grounding.
Most popular related searches
The kit includes:
- cauldron,
- storage tank,
- filling vessel,
- Mini controllers (controllers, fans, boiler connection to the accumulation tank.
To meet the needs of investors we have created a line of biomass boilers Ekopal RM in container construction.Advantages of container boiler:
- Speed and ease of installation (eg no boiler room permit required)
- Separate the boiler room from the building (cleanliness, space saving in the building)
- Limited adaptation work to a minimum
- Convenient access to the boiler room when loading