Zhejiang Yongtailong Electronic Co.,LTD

YTLprepaid meter 3*240(415)V Split Type ThreePhase 4 Module Electrical Meter PLC/RF/GPRS modem Nigeria standards

SHARE
It is three phase four wire prepayment keypad meter with multi-functions, which measure forward and reverse power, total active power,remain credit and consumption credit etc. Inner meter use credit to calculate for managing well.Meanwhile, the prepayment meter has many communication options like RS485 ,RF, G3 PLC and GPRS communication. This meter must work with IHD together.
Most popular related searches


type                                                3-phase 4-wire:Direct type
Accuracy class                                  1.0 (or better)-active energy/2.0-Reactive Energy
Voltage                                            3*240/415VAC
Frequency                                        50Hz
Ib/Imax                                           Direct type: 5/100A;
Min Starting Current                         Class 1:40mA/Class 2: 50mA
Over-voltage rating                          Withstand 420VAC for 48 hours
Measurement                                   Each phase and neutral current measurement
Alarm                                              PF;voltage dip/Low voltage;Temperature near terminal block
Tamper inputs                                  Meter cover open;Terminal cover open;Comms module cover open;Strong magnetic field tamper
Communications                               RS485 (always present)
                                                       IR (always present)
                                                       Plug-in module:
                                                       PLC (G3)
                                                       GPRS
                                                       LoRa
                                                       Protocol: DLMS
Tariff                                                Multi tariff
Maximum demand                            Configurable integration period-with auto reset on the 1st of every month.Manual reset must also be possible via secure short code method.MD                                                        to be part of scroll display.
Load management                             Support second configurable load limit threshold that becomes active during configurable periods
Standards compliance                        IEC62052-11
                                                       IEC62053-21
                                                       IEC62056-46
                                                       IEC62056-61
                                                       IEC62053-61