Electrical Equipment Acceptance Testing Services
Nearly 70 percent of early equipment failures can be traced to power system design, installation, or startup deficiencies. That`s why it`s so important to protect your plant’s investments in new electrical equipment or systems with independent, third-party acceptance testing. Electrical power system commissioning and acceptance testing, prior to energization, can uncover problems and allow you to make corrections before they escalate and become more costly in the future.
Most popular related searches
electrical equipment
electrical testing system
electric power
electrical power
electrical system
power testing system
electrical engineering
power testing
power test
- Ensured quality installation supports system reliability and reduces the threat of costly downtime
- Safer startup occurs as experienced technicians adhere to applicable testing guidelines
- Maximized operating efficiency is due to thorough acceptance testing that eliminates common installation errors that adversely impact operations
- Enhanced system integration happens as equipment experts ensure equipment is installed per manufacturer specifications and design intent
- Accurate baseline data is collected and used for improved asset management
- Pre-functional verification includes inspection to verify proper installation prior to testing and covers the checking of belt tension, oil levels, labels, gauges, and sensors
- Functional testing is performed in all operational modes to confirm that equipment operates according to the design intent
- Integrated systems testing verifies integrated functional operation of critical systems under designed load and emergency conditions
- Comprehensive report includes testing results and any recommendations for infrastructure changes