Engineering, Procurement & Construction (EPC) Services
FromENO Energy GmbH
Safe from production facility to construction site. Transportation of an eno wind turbine. Transporting a wind turbine is often a logistical feat. As well as the challenge of loading rotor blades, which have continually increased in length due to further developments, adequately onto a heavy goods vehicle and passing through sometimes narrow forks, the weight is also a crucial factor when crossing bridges or coping with inclines. To minimize transport risks, eno energy uses transport and route studies beforehand to check the situation on site, and only contracts experienced transport companies who have the required expertise when handling sensitive heavy goods.
Most popular related searches
- Creation of a feasibility study for transportation and the route
- Securing the site areas for use and pivoting over the heavy goods transport area
- Contracting and coordination of the route study
- Calling for tenders and selecting the carrier
- Communication with the transport company over the period of the entire transport process
- Supporting transportation
Setting up and commissioning
Once the wind turbine components have arrived at the installation site, eno energy takes over the construction site coordination for building the wind turbine. Here, the 137m-tower of an eno126 alone consists of two half-shells at the base of the tower and five further tower sections on top of this. With the ideal wind and weather conditions, the construction only takes a few days. The cabling work and network connection of the wind turbine are carried out by experienced eno technicians who, through flawless commissioning, will ensure that the turbine can feed environmentally friendly power into the public network quickly.
Our services for you
- Contracting a suitable crane company
- Monitoring and coordination of the construction site activities
- Turnkey setting up including cabling
- Network connection and commissioning the wind turbine