Grid Export Limiting Solution
Cleanearth can enable customers to maximise their renewable energy potential on site using an export limiting technology. Government policies are encouraging companies and landowners to be environmentally conscious and install renewable energy to reduce carbon emissions. However, the electric grid distribution system was originally designed for energy to flow in one direction – from the power station to the home / business – and not to flow both ways. As such, the UK grid system has physical constraints in relation to the distribution of energy generated.
Overview Services
Many applications for renewable energy come with two options from the Distribution Network Operator (DNO):
- Pay a large amount to upgrade the local network or transformer to enable the renewable energy installation to take place, or
- Restrict your installation to a certain size according to exported power restrictions
Until now, many businesses and landowners have not been able to install the size of renewable energy system on their sites that matches their demand because of these constraints and / or associated grid upgrade costs. At CleanEarth we are changing this for our customers by utilising a new technology.
Customer reviews
No reviews were found for Grid Export Limiting Solution. Be the first to review!