You might need to change your building’s electricity supply connection and meter if you are refurbishing a commercial property or installing new equipment that needs more power than the current connection can cope with.
-
Most popular related searches
There are three steps to the process:
There are three steps to the process:
- Cables and MPAN: If you need to change the cabling, first contact your local Distribution Network Operator. Once they have everything in place, they will give you a new Meter Point Administration Number (MPAN) that we can use to register your new meter.
- Meter installation: With your new MPAN, we can arrange an installation date. We need at least 20 working days’ notice and the process involves a credit check. Within the London distribution area (MPAN begins 12), you’ll need to install a current transformer (CT) cabinet for any CT supply.
- Electricity supply contract: As part of the process we’ll offer you a new electricity supply contract. This might require a security deposit, depending on your credit status. If you haven’t signed a contract before we issue your first invoice, we will calculate your charges based on our deemed prices
Commercial Property Currently Under Construction
Connecting a site under construction
If you’ve started building a commercial property and need electricity quickly, we can connect you quickly and smoothly to a temporary or permanent supply. We:
- help you through do all the form-filling and bureaucracy so your schedule isn’t impacted
- check the electricity meter is the right type for your site
- make sure everyone in the process has the right information
- tell you when people will be on-site to do their bit
- finish off the job with a competitive meter operator contract for you.
Commercial Property Development in the Pipeline
Plan ahead for cheaper connections
Thinking ahead before you’re ‘boots on’ and at site can cut your electricity costs significantly. The earlier you get in touch with us, the more we’re able to do to cut down your electricity costs.
- We can design a connection that not only suits your site, but also costs 20-30% less, on average, than your local network company’s solution.
- By forecasting your site’s electricity use, we can get you a better rate, reducing your electricity bills in the long term.