ANDRITZ Energy & Environment GmbH

Large New Installations

From

0

The ANDRITZ HYDRO “Large Hydro” Division is a global supplier of turnkey electromechanical equipment and services for the installation of large new hydropower plants (“water to wire”) and components, including installation beyond the compact hydro range.

  • Engineering, design, model testing, purchasing, manufacturing, assembly, project management, all mechanical and electrical equipment, and the monitoring and diagnosis systems
  • Turbines (all types)
  • Digital speed governors
  • Shut-off valves
  • Generators (synchronous and asynchronous)
  • Electrical power systems including low, medium, and high voltage equipment
  • Automation, control, protection, excitation, and synchronization
  • Site management, installation, commissioning, testing, training
  • Large rehabilitation projects

  • Design, engineering, project management, shop and field fabrication, installation, testing, commissioning and rehabilitation of all kinds of gates and penstocks for hydropower plants, ship locks, water supply, and irrigation projects such as:
  • Exposed and embedded penstocks
  • Pipe bridges and steel tunnel linings
  • Manifolds and bifurcations
  • Radial gates, flap gates
  • Intake and outlet equipment
  • Bottom outlets (h>180 m)
  • Spillway and ship lock equipment
  • Trash racks and raking equipment
  • Hydraulic and mechanical hoists
  • Automation and controls
  • Spare parts

Customer reviews

No reviews were found for Large New Installations. Be the first to review!