The first step of a successful revitalization is a survey of the current hydropower equipment.
After detailed data collection, our experts prepare a technical evaluation of the system to determine which components need to be overhauled or replaced. In addition, a profitability analysis can provide valuable insights.
This comprehensive analysis ultimately results in several options, from which we select the most economical one together with you.
We take care about both the disassembly and the pre-assembly at our factory. The overhauled components of the hydropower plant are then reinstalled in the power plant.
