OPRA - Gas Turbine Installations Services
An oil and natural gas corporation required on platform power generation. They had existing KG2 gas turbines installed on the platform and wanted to find an alternative to their existing installation that provided additional power output along with higher electrical efficiency. To ensure the installation and commissioning phase would not be disruptive or costly, they needed to find equipment that could use the existing footprint of the KG2 gas turbines that were installed.
Services Details
Why replace existing KG2 turbines with OPRA equipment?
By choosing to install an OP16 gas turbine they ensured high availability of their installation with up to 99% guaranteed and an extra 10 efficiency points over the previously installed gas turbines. The robust, all radial design of the OP16 along with its advanced combustion technology ensure the latest state of the art technology with an integrated remote monitoring system. Remote monitoring allows for predictive rather than reactive maintenance. This system helps to prevent downtime and ensures that OPRA equipment is performing at its maximum potential which can satisfy a 24/7 production line.
Customer reviews
No reviews were found for OPRA - Gas Turbine Installations Services. Be the first to review!