Solar Power Plant Evaluation
From Solar Consulting
We evaluate every nook and cranny to make sure that your solar power plant/system is of acceptable international standards. The evaluation includes an array of inspections and tests. Saurya EnerTech performs third party solar evaluation to evaluate a power plant and its functioning. Sometimes small details such as wiring size, warning signs and material used can make a big difference towards the functioning of power plant. We are here to evaluate every nook and cranny to make sure that your power plant is of acceptable standards.
Services Overview
Our inspection is based on IEC : International standard for Photovoltaic(PV) stand
alone systems-Design verification. Our tests are very exhaustive and cover all relevant issues. It may take about 2-3 days for our engineers to perform the inspection depending upon the size of the plant.
The solar evaluation includes and may not be limited to the following sets of inspections and tests:
- Visual Inspection
- Field Inspection for Array
- Performance Tests
- Specifics For Ground Mounted Arrays
- Installation of Appropriate Signs
- Equipment ratings
- System functioning
Customer reviews
No reviews were found for Solar Power Plant Evaluation. Be the first to review!