Likusta Umwelttechnik GmbH

Targeted Modernisation And Facility Optimisation Services

SHARE

Plants for the purification of waste gas or waste water are very long-lived investments with a useful life of 25 years or more. However, operational safety and function must be ensured at all times. An evaluation by an experienced Likusta engineer can help here. This means sensible measures can be developed and evaluated depending on your priorities. 

Most popular related searches

Typically, these are:

  • Refurbishment or renewal

  • Expansion

  • Improved control

  • Cost reductions and energy saving

Many measures are already economical after a short time

The required actions are usually clear after an on-site technical determination and profitability analysis: In many cases, the rehabilitation of an existing system is a cost-effective measure. Our Likusta service team ensures fast implementation of the work on site.

As demands and operating conditions change in the course of time, many of our customers opt for system optimisation. Analysis of the operating data indicates the direction of the optimisation required: Many measures reach break-even within a short time due to reduced operating costs.

Modernisation or upgrades are not limited to system components or auxiliary units: The further development of the PCS, e.g. for the integrated control of existing system components or the retrofit of a remote maintenance module, are often the correct solution and help to open up the full range of performance of your system.