Splainex - Turn-Key Pyrolysis Project
Pyrolysis for Environmental Friendly Conversion of Coal Power Plants. Scope of Work and Services: Scope of work is based on the provisions of the ICC (International Chamber of Commerce) Model Contract for Turnkey Supply of an Industrial Plant: design and engineering, supply and deliver (either FCA or DAP), supervise erection and commissioning, do personnel training. Feedstock and project goals determine scope of work for a particular pyrolysis project. Typical equipment supply for waste-to-energy pyrolysis plant presented.
- Pre-sorting
- Shredding
- Drying
- Pyrolysis Kiln
- Combustion Chamber with Burner Management System
- Carbon Recovery Sub-Unit (as required)
- Heat Recovery Steam Generator
- Turbine/Generator set
- Steam Condenser
- Gas Cleaning Sub-Unit
- ID-fan
- Stack
For pyrolysis oil project UNIT 3 (Energy Recovery) will be replaced by Oil Condensation and Storage UNIT. If one of the products is a solid phase from pyrolysis, e.g. biochar, then Carbon Recovery Sub-Unit will be excluded from UNIT 2.
Any scope of the equipment supply will be completed with the following supply and services:
- Ducts, pipes and fittings
- Steel structure, stages and stairs
- Electrical equipment
- Instruments and control equipment
- Plates and signage
- Technical documentation
- Inland transport and Packing (FCA delivery) and shipping (DAP)
- Assistance in on-site erection and commissioning
- Training of operating staff during commissioning
Any feasible variants of scope of work are discussible during the contractual negotiations.