SIMAHPP5 is for multi-site simulation to determine design flows and to choose appropriate hydro turbine, optimize time of operation so as to maximize annual energy production, determine the energy revenue, estimate investment and maintenance costs, determine amortization rates, Net Present Value (NPV), Internal Rate of Return (IRR), payback periods. SIMAHPP5 takes into consideration the environmental impact of the project such as in terms of value generation by reducing carbon emissions or other environmental risks. SIMAHPP 5 is provided with features for sensitivity analysis, turbine efficiency editor, and report generation.
Compared to its predecessors, i.e. SIMAHPP 4.xx, SIMAHPP 5 has the following key features:
- Single-purpose (only hydro scheme) or multi-purpose scheme (hydro + options for water supply, irrigation, and other water needs)
- Multi-year data record and analysis (40+ years data per scheme)
- Options for additional financial benefits (such as from irrigation, flood protection, water supply, navigation, fisheries, carbon sales, recreation)
- Options for environmental impact evaluation (such as population displacement, wildlife, aquatic loses, forest loses and other land changes and integration of environmental action plans, etc
- Data options for weekly and hourly mean, in addition to daily, monthly and annual mean
- Options to use head losses using Darcy-Weisbach, Manning, Hazen-Williams
- Efficient algorithm for appropriate turbine selection and computation of corresponding specific speeds, penstock diameter, static pressure
- A wide range of units for input and output parameters (SI, US/UK systems)
- Long list of penstock materials with the corresponding roughness properties
- Sophisticated data visualization for both input and output data (multi-year, multi-site, multi-parameter).
- Reverse vertex analysis, multi-scaling, multi-line, zoom, export, and many…
- Sensitivity analysis & sensitivity index (SI) visualization
- Summarize and generate simulation report
- Project characteristics, classified as Energy Production, Economic Analysis, Environmental Impacts, Equipment & Materials
- Site location map
- Net Framework
- A summary of project simulation output per project site is as follows:
Energy Production: analysis on the energy production capacity of the hydropower scheme provides with results on
- Net head using three head loss methods
- Design flow from FDC (Flow-Duration Curve),
- Design time of operation for maximizing energy
- Optimum power capacity
- Maximum energy production
Economic Analysis: analysis on the financial feasibility the hydropower scheme provides with results on
- Energy sales revenue,
- Carbon market revenue,
- Additional revenues in case multi-purpose from domestic water supply, irrigation water, flood control, navigation, recreation, fisheries,
- Investment cost,
- Investment cost/kW,
- Investment cost/kWh,
- O&M cost, net present value (NPV),
- Internal rate of return (IRR),
- Payback period,
- Amortization plan
Environmental Impact and Management Plan: analysis on environmental impact and the management plan of the hydropower scheme provides with results on
- Emission reduction,
- Population displacement,
- Wildlife migration,
- Aquatic habitat losses,
- Forest clearance,
- Land use change,
- Resettlement program,
- Watershed management,
- Tree planting,
- Public awareness program
Equipment and Materials: analysis on the system characteristics results in the type of equipment and material
- Turbine type,
- Specific speed,
- Penstock size
- Penstock material