
Electrical Generating Systems Association (EGSA)
Creating an Alternate Power Generation Source that Maximizes Efficiency & Redundancy - Video
Ronnie Carroll (Genset Application Specialist for Basler Electric) and Michael Brown (Light Tower Rentals, Inc.) discuss a challenging case study on a Midstream Company that required 100% backup for a gas processing plant. This system was successfully paralleled to utility and took the entire plant load in approximately 18-20 seconds consistently with all generators starting and paralleling across the five group breakers.
Most popular related searches