electrical installation Articles
-
Industrial Electrical Installations and Automation - Case Study
The Rosilo company stands out in the field of industrial electrical installations and automation, offering top solutions for various industries. With a vast experience in the implementation of these complex systems, Rosilo has established itself as a market leader, ensuring efficiency and reliability in all its ...
-
Measurement accuracy
No instrument can be guaranteed to give readings that are absolutely accurate every time or exactly the same as another apparently identical instrument. Several factors influence the ability of an instrument to make and display a measurement. Before we look at sources of error during a measurement, it is important to understand the limitations of an instrument and how they affect the ...
-
Offshore tidal lagoon- Mexico - Case Study
Tidal Electric is pursuing a project in Mexico's Gulf of California, between Baja Norte and Sonora. The gulf holds a very significant tidal resource and is positioned to provide electricity to both Southern California and to Mexico, making it an ideal location for a large scale Tidal Electric ...
-
Port of Poole Marina - Case Study
Project: Marina WC/Shower Facilities Client: Poole Harbour Commissioners Completed: 2011 Floor area: 30m2 Location: Southampton Floor area: 48m2 Duration: 8 weeks Value: £40,000 Turnkey service elements completed: Full design process Manufacture off-site Mechanical and electrical installation Delivery ‘What stood out was your attention to detail, listening to what we needed ...
By Modulek
-
Cork Airport, Terminal 2
Cork International Airport is one of Ireland’s main airports. It is situated on the south side of Cork City and at the moment is operated by the Dublin Airport Authority. The first phase of the terminal expansion and development plan, providing an extension to the terminal and a new pier was completed in 2006 bringing the capacity up to 2.5 million passengers. Suir Engineering’s scope ...
-
Thornden Tennis Club - Case Study
Project: Permanent Tennis Club Pavilion Client: Thornden Tennis Club Completed: August 2010 Floor area: 50m2 Location: Winchester, Hampshire Duration: 2 weeks Value: £35,000 Turnkey service elements completed: Full Design Process Manufacture offi-site Mechanical and electrical installation Factory fitted pitched roof Delivery and installation Roller shutter installation ...
By Modulek
-
Maiden Newton Childrens Centre - Case Study
Project: New Children’s Centre Client: Dorset County Council Completed: June 2010 Floor area: 130m² Duration: 5 weeks Location: Maiden Newton, Dorset Value: £250,000 Turnkey service elements completed: Base preparation Manufacture off-site Mechanical and electrical installation Delivery and installation Access ramps and footpaths Extension of existing netball court ...
By Modulek
-
Proton - TCC 1000 kW AA Services Baku
This mobile TCC was delivered to AA Services for operation in Baku: Installed in 2013 1000 kW electrical drive Mobile outdoor installation ...
By Thermtech AS
-
IEC 60364-8-1:2019 - State-of-the-art for energy efficiency in electrical installation
IEC 60364-8-1:2019 is part of the IEC 60364 series of standards and enhances Parts 1 to 7 with the introduction of requirements and recommendations to design the electrical installation, which provides the best compromise between the required level of service and safety and the lowest electrical consumption. It applies to new or existing installations and those under evolution and should be ...
-
Featured Installs, Cattani Project - Case Study
Cattani are an Internationally renowned engineering company based in Thornbury, Victoria. They specialise in suction systems and oil free compressors. Their warehousing facility has a varied amount of energy use that requires a fair amount of electricity. Nu Energy installed a solar system across Cattani’s three separate roof spaces on the same block. Monitoring has also enabled Cattani to ...
By Nu Energy
-
Ghost Series AB-20 x 20’ Enclosed Combustor - Case Study #170205
PROJECT DETAILS Location: Permian Basin Flow Rate LP: 20.0 MSCFD LP Inlet Pressure (ΔP): 4 oz/in.2 Smokeless %: 100% Pilot & Controls: ProFire2100 Solar Package: No Electricity Required Installed Year: 2017 Aereon’sGhost Series Enclosed Combustor (EPA Certified for Quad O Compliance) is used to burn off waste natural gas from a low pressure tank. The technology used ...
-
Ghost Series & Momentum Series Combo AB-20 Combustor / HP-1500 Flare - Case Study #170203
Project Details Location: Permian Basin Flow Rate HP: 1.5 MMSCFD HP Inlet Pressure (ΔP): 50-75 PSIG Flow Rate LP: 20.0 MSCFD LP Inlet Pressure (ΔP): 4 oz/in.2 Smokeless %: 100% Pilot & Controls: ProFire 2100 & 1300 Solar Package: No Electricity Required Installed Year: 2017Installed Year: 2017 Aereon’s Ghost/Momentum Combo Package (EPA Certified for Quad O ...
-
Dorton College Royal London Society for the Blind case study
About Dorton College Founded in 1838, the Royal London Society for the Blind (RLSB) has a long and distinguished history in helping blind and partially sighted people to achieve their goals in education, training and employment. RLSB's Dorton College of Further Education supports their mission to removing barriers to personal fulfilment and social inclusion by providing a complete educational ...
-
Our Go Green initiative ‘goes electric’!
As sustainable travel becomes a more pressing global issue, we’ve taken action and made it a reality here at Plasma Technology with our Go Green initiative! Two recent initiatives have been put in place at the company near Bristol with the support of local authority, North Somerset Council. With over 100,000 electric vehicles now on our roads, a greater choice of vehicles, and more ...
-
Fault characteristics in electrical equipment
Proper design and installation of electrical equipment minimizes the chance of electrical faults. Faults occur when the insulation system is compromised and current is allowed to flow through an unintentional path. IEEE Std 493 Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems1 publishes data that reports that the vast majority of faults are classified as ...
-
6 Common Mistakes in your Predictive Maintenance Plan
Carrying out a predictive maintenance plan is a smart way to avoid future costs, you know that. And in order to do this, you will need predictive maintenance software and a plan. But what are the most common mistakes made in a maintenance programme of this type? Here is a list of the 6 most common errors made by building managers and/or facility managers. What is a Predictive Maintenance Plan? ...
-
Waste treatment biogas plant Wallingford (UK) 2.4 MW- case study
Waste Treatment Reference Plant – Wallingford Description of project: AD Plant for treatment of organic waste and animal byproducts with an installed electrical power of 2.4 MW Type of Plant: AD-BT Total aggregate input capacity (waste): 70.000t/year Location of Project: Wallingford, Oxfordshire, United Kingdom Date of Completion 2012 Is the plant operational and has been operational ...
-
Strategy for combining fast growth in electricity generation capacity with the early introduction of the thorium cycle in India
The purpose of this paper is to describe a strategy for combining fast growth in electricity generation capacity, with the early introduction of the thorium cycle in India. Three types of Liquid Metal Cooled Fast Breeder Reactors (LMFBRs) are considered: LMFBR 1, with plutonium/depleted uranium driver zones and depleted uranium blankets; LMFBR 2, with self-sustaining plutonium/depleted uranium ...
-
Various Uses of Solar Lights
Solar lights play a major role in this current age due to the numerous developments that have been made over time. They initially lasted less than a day or just for a few hours at night because there was minimal energy to go around. Solar lights right now can last a couple of days because of the solar unit’s ability to store electrical energy in the rechargeable battery. This has opened up ...
-
Combined Heat And Power Distillery - Captain Morgan - Case Study
OWNER DIAGEO LOCATION St. Croix, US Virgin Islands PRODUCT Centaur® 50 (4.6 MW) Gas Turbine CUSTOMER VALUE LPG Fuel and Cost Savings On the island of St. Croix, located in the Virgin Islands, the Captain Morgan rum distillery uses a Centaur 50 gas turbine for combined heat and power (CHP). The unit provides both electricity and steam for the distillery's operations. Diageo chose the ...