medium wind turbine Articles

  • Medium scale wind turbine near colchester case study

    In September 2009 planning permission was granted for a medium scale wind turbine on a farm near Colchester. The wind turbine, which has a maximum blade tip height of 49m, was installed in Spring 2010. Green Dimension undertook the feasibility work, stakeholder consultations and the preparation of the successful planning application on behalf of the farmer. Key stakeholders included ...


    By Green Dimension

  • The economics of wind energy within the generation mix

    With more than 15,000 plants of different capacity ranges, Germany has become the world's No. 1 in generating electricity from wind power, covering around 4% of the electricity requirements at home. This is due on the one hand to the successful promotion by the Renewable Energy Act (EEG) and, on the other hand, to the tax breaks from loss allocation and depreciation. During low-load periods, load ...


    By Inderscience Publishers

  • Power curve measured and verified – Case Study

    In 2010 RSE SpA (Energy System Research Inc.) within a Program Agreement with the Italian Ministry of Economic Development started a measurement campaign on a Libellula wind plant installed in Tuscany. The campaign lasted 1 ½ years and during this time RSE measured the turbine’s power curve following the requirements of the relevant IEC Standard ...


    By Aria s.r.l

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you