GARN products
Wood Heating Systems
GARN - Wood Heating System
The WHS-1500 wood boiler is great for installations where the WHS-2000 is a little too big for the install space. The boiler is designed for heating up to 7,500 sq ft and can easily be installed in an existing building or lean-to addition. The tank is rolled and is 8 ft long; the entire unit is just under 9 ft long. The 1500 is built with pride by American workers and has a minimum steel wall thickness of 3/16″ with 1/4″ heads. The large, Schedule 40, 4 inch diameter heat transfer tubes never plug and transfer heat efficiently to the water. The manway ring can be ordered with a fitting for use with a solar thermal drainback system, perfect for storing heat from the sun!
Other Products
GARN - Sequencers (49.5 kW)
The 49.5 kW sequencer includes: Two (3) Sequencer boxes (270 amp, 240V, Single Phase). Two Banks of 3 Breakers (30 amp each Breaker), pre-wired to a bank of time-delay relays. Three banks of time-delay relays allows for hookup to a maximum of 9 electric elements at 5.5 kW each. Hi Limit Switch (factory set at 190°F – NOT adjustable). Qty (18 + Extras) Crimp connectors for #10 stranded wire – a pair of crimp connectors is required for each element. The required 10 AWG wire from sequencer box to the elements is NOT included and must be provided by others.
GARN - Blower Motor Electric Isolation Bushings
The isolation bushings are designed to prevent undirected current from reaching the GARN tank. Included in the kit; Five (5) high-temperature Nylon isolators. 5 Type B Washers (3/8″ ID, 1″ OD Flat Washer).
GARN - Replacement Filters for the Bypass/Side Stream Unit (5 micron) Pack of three
Replacement Filters for the Bypass/Side Stream unit are sold in packs of three (3). 5 micron, Stainless Steel Core, Filters are spun polyester with a SS core. These filters are to be used with the “Bypass/Side Stream” unit (P-0108) as described in the “BYPASS/SIDE-STREAM FILTER INSTRUCTIONS” section of the GARN Owners Manual(s).
