Scatec Solar Solutions GmbH
PV Ground Mounted - Sulkov, Case Study
wwsolar park Sulkov 10.0 MWpwww.scatecsolar.comElectrical design in the solar park: 43,320 solar modules laid out in 1,805 strings. 14 central inverter stations. Each has a transformer station. The length of the cables from the string-monitors to the inverters is 175 km, from the modules to the string-monitors 375 km.The solar park is monitored using remote data transmission methods and monitoring software which offers a high level of internet support. Concrete block foundation: individually designed foundation technology especially for waste dumps which ensure, that the foil will not be damaged.Headquarter Oslo, NorwayScatec Solar ASSommerrogaten 13-15 NO-0255 Oslo, NorwayProfile of the solar park SulkovBasic dataSize of area 67.296 hectares (solar field)Location: Czech Republic, community of Sulkov E 13° 18´ N 49° 42´Installed capacity: 10 MWp (nominal, DC)Electrical design: 14 inverters, 227 string-monitorsPV modules: 43,320 PV modules in 1,805 strings (220 - 240 Wp each, Si, polycrystalline)Global Solar 1,088 kWh / m2 / year Irradiation: (in horizontal plane)Specific yield: approx. 1018 kWh / kWp p.a. (“normal” year)Performance Ratio: approx. 83.3 %Energy yield: approx. 10,180,000 kWh per year (first full year)Ecolocical profileCO2 savings approx. 6,108 t per yearClean energy for 8,483 citizens (approx. 1,200 kWh per year / citizen energy consumption)Photo was taken during construction phase.
Most popular related searches