Transformer Testing Articles & Analysis
7 news found
We test every transformer to satisfy the standards required by IEEE Standard C57.12.01 for Dry-Type Transformers and IEEE Standard C57.12.00 for liquid filled transformers. Our testing equipment ensures the highest quality transformers that meet all IEEE, and NEMA standards. We also offer ...
S&C's new TranShield Transformer Protector eliminates nuisance fuse operations at the grid's edge and drastically reduces unnecessary maintenance expenses. Industry data show that up to 70% of overhead distribution transformer fuse operations are classified as nuisance outages, where no other repair work is needed aside from fuse replacement. These instances ...
Following a EUR 70 million, multi-year investment, the KEMA HPL is the first facility in the world for testing UHV electrical grid components including power transformers up to 800 kV and switchgear up to 1200 kV. The expanded lab has now successfully completed dynamic short-circuit testing on 800 kV class power transformers. ...
At the Niagara Power Plant, mPrest's software platform analyzes information from sensors on electrical transformers to automatically diagnose their operational health and predict potential malfunctions and failures. These new capabilities enable strategic maintenance of the transformers optimizing their efficiency, avoiding outages, reducing operational costs and ...
Biochar also has the potential to beneficially alter soil nitrogen transformations. Laboratory tests have indicated that adding biochar to the soil could be used to suppress nitrous oxide derived from livestock. ...
Biochar also has the potential to beneficially alter soil nitrogen transformations. Laboratory tests have indicated that adding biochar to the soil could be used to suppress nitrous oxide derived from livestock. ...
When a 46-year-old GE transformer failed and a 40-year-old spare transformer with questionalble reliability was pressed into service, ABB offered the fast solution needed. ...
ByABB