GE Power

GEModel LMS100 - Aeroderivative Gas Turbine

SHARE

A single, economical solution for the dispatch needs of nearly every industry condition.

Most popular related searches
Flexibility

The LMS100 can provide power at part load as efficiently as most gas turbines at full load, and can operate with very little power loss, supporting the grid in times of high demand.

Fast start

Its intercooled gas turbine system provides rapid startup, with an 8-minute start to full load and emergency ramp speeds of up to 500 MW/minute.

Modular configuration

Construction includes a modular “supercore”, which can be exchanged in less than four days to enhance plant availability.