DP CleanTech

EnergosWaste to Energy Gasification Technology

SHARE

DP’s gasification solution is a commercially proven European waste to energy gasification technology from Energos. This extensively proven technology is suitable for converting all types of non-recyclable commercial and household waste to energy; and has the added benefit of very low emissions. The patented technology is highly flexible and modular, to meet smaller scale needs for distributed power and can be expanded accordingly to optimise fuel processing capacity and energy production.

Most popular related searches

Energos technology is commercially successful and technically proven since 1997. With over 800,000 operating hours at 8 plants across Europe, and with availability levels of up to 8,000 hours p/a, the plants are plants are commercially successful. With this and help local authorities meet the EU Landfill Directive.

The ENERGOS plant design is offered with two standard boiler capacity designs:

  • A Type 40 plant features a boiler with a nominal capacity of 13.5MW.
  • A Type 50 plant features a boiler with a nominal capacity of 16.4MW.

There are two standard module sizes that relate to the fuel processing capacity of the gasifier. They have the nominal capacity to treat either 5 tonnes per hour or 6 tonnes per hour.

Engineering
The modular technology facilitates flexibility in materials and plant scale, and can be used with a wide range of unrefined waste materials. It features a patent-protected combustion furnace with grate and rod feeder, and is managed by a proprietary control system which operates the 2 stage thermal conversion. Stage one: Primary chamber where gasification of the waste takes place to produce a synthetic gas. Stage two: Secondary chamber where the synthetic gas is oxidised at a high temperature. A highly controlled process enables a simple dry flue gas treatment system to be employed, eliminating the need for a sophisticated and costly end of pipe flue-gas treatment system, and ensuring low and stable emission levels.
Plant main system
  1. Fuel bunker
  2. Fuel crane
  3. Hopper
  4. Primary chamber (Gasification)
  5. Secondary chamber (High temperature oxidation)
  6. Heat Recovery Steam generator (HRSG)
  7. Lime and carbon silo 8 Bag house filter
  8. Filter residue silo
  9. Flue gas fan
  10. Chimney
  11. Bottom ash extraction
  12. Steam turbine
  13. Air cooled condenser
  • Modular, community-scale solutions reduce transportation logistics and costs.
  • Guaranteed low emissions without de-NOx or ammonia or urea FGC injection
  • Guaranteed low emissions without de-NOx or ammonia or urea FGC injection
  • Low operation and maintenance costs
  • Low operation and maintenance costs
  • High availability up to >8,000 hours pa.
  • High availability up to >8,000 hours pa.
  • <3% TOC guaranteed low carbon content in the bottom ash
  • <3% TOC guaranteed low carbon content in the bottom ash
  • Carbon leaching 90% lower than standard EfW processes.
  • Carbon leaching 90% lower than standard EfW processes.
  • Eligible for exemptions (ROC’s, Climate Change Levy (CCL) and CO2 emissions)
  • Eligible for exemptions (ROC’s, Climate Change Levy (CCL) and CO2 emissions)