Clarke Energy
Liverpool ,
Merseyside L33 7RR
United Kingdom
GE Jenbacher - Model Type-4 - Gas Engine
Based on the proven design concepts of Type-3 and Type-6, the modern Type-4 engines in the 800-1,500kWe power range are characterised by a high power density and outstanding efficiency. The optimised control and monitoring provides easy preventative maintenance and maximum reliability and availability.
-
Most popular related searches
Benefits
- Highest electrical efficiency in its power class.
- Maximum levels reliability & availability.
- Optimised for ease of service.
Features
- LEANOX lean burn control ensures minimal emissions.
- Modern engine concept increases service-friendliness.
- High-power turbocharger allows optimal operation at higher air intake temperature and altitude.
- Low NOx emissions versions available <250mg/Nm3 for biogas, achieved without the requirement for an exhaust catalyst.
Related news
-
Mineral Resources Limited Selects Clarke Energy for Ken’s Bore Power Station
Mining company Mineral Resources Limited (MinRes) has chosen Clarke Energy as its preferred partner for a second time, having reached agreement on a new 26.9 MW power station for its Onslow Iron project now under construction. Key to the project will be the Ken’s Bore mine operation, planned to produce an estimated 35 million tonnes per annum of iron ore in the West Pilbara, with the first ore scheduled for June 2024. The Clarke Energy design will supply mine and process related infrastructure at Ken’s...
-
Clarke Energy Australia Participates in the Diggers & Dealers Mining Forum
In August, representatives from Clarke Energy Australia attended the Diggers & Dealers Mining Forum, held in the heart of Australia’s gold mining community, Kalgoorlie, Western Australia. The Forum was attended by over 2,000 delegates from across the world and combined 66 presentations by leading minds within the resources sector, discussing the future of the industry, alongside an exhibition area housing over 150 exhibitors including exploration companies, equipment and service providers, and government...
-
Clarke Energy and Danone to Develop Resilient Microgrid Project in South Africa
Moshesh Partners has selected Clarke Energy to supply a gas fuelled combined heat and power (CHP) unit and microgrid controller for a Danone SA dairy food manufacturing plant in Boksburg. The microgrid will incorporate INNIO’s Jenbacher engines and microgrid controller, existing solar photovoltaic power array and diesel engine back up and will be grid connected. Moshesh Cogeneration, a special purpose vehicle owned by Moshesh Partners and backed by Rand Merchant Bank, has selected Clarke Energy to...
-
Clarke Energy Innovates in the Recovery of Blast Furnace Gas From Ferro-Alloys
Clarke Energy France, a leader in the engineering, installation, design and maintenance of decentralized power generation solutions, is presenting its innovative project to recover blast furnace gas at an industrial site in Norway. This turnkey solution will enable the ferromanganese plant to increase its energy efficiency and reduce its environmental footprint from July 2024. Clarke Energy is an expert in gas-fired power stations and combined heat and power technology. As a turnkey solutions provider, the...
-
Keystone RNG Project Complete at BioTown Biogas in USA
Clarke Energy is pleased to announce the official commissioning of our most recent renewable natural gas (RNG) project completed in the United States. The site at BioTown Biogas in Reynolds, Indiana is now home to one of the largest on-farm biogas upgrading facilities in the country. Carefully processing roughly 500,000 gallons/day of agricultural waste – this system highlights Clarke Energy’s ability to deliver the latest biogas upgrading equipment for large-scale sustainable agriculture practices...
-
Mineral Resources Limited Selects Clarke Energy for Onslow Port Power Station
Mining company Mineral Resources Limited (MinRes) has chosen Clarke Energy as preferred partner for its new 14MW Onslow Port Power Station. The gas power station will support all port related activities for MinRes’ planned Onslow Iron project – set to unlock 30 million tonnes per annum of iron ore in the West Pilbara – with ore to be transported by a private road to the Port of Ashburton, then ferried by transhipping vessels to bulk ore carriers and onwards to international markets. For...
-
Clarke Energy: Developing Talent and Providing Workplace Longevity
Clarke Energy continues to prioritise business growth by investing in its workforce through its apprentice scheme. The apprenticeship program in Australia remains a vital tool for attracting and nurturing top talent, as our experienced and highly trained personnel impart their skills and knowledge to the next generation of employees. We sat down with two of our current apprentices, Cody Schwartzkopff, a first-year apprentice, and Lachlan Richard, who started with us as one of our very first apprentices back in...
-
World’s First 100% Hydrogen Backup Power Solution
In a world first, NorthC Datacentres (NorthC) have selected INNIO’s Jenbacher 100% H2 capable engines for backup power of their upcoming data centre in Eindhoven, Netherlands. Six Jenbacher Type 4 engines have been acquired to deliver 1MW of continuous power each, as a backup solution in the event of a disruption to their grid connection. Onsite hydrogen storage will ensure that the data centre is able to operate without interruption, even in the most challenging conditions. Importantly, the Type 4 engines...
-
Clarke Energy Install Medicef Pharma Trigeneration Plant in Tunisia
After one year of operation, the Medicef Pharma trigeneration plant, composed of a INNIO Jenbacher gas engine Type-3 J316 (with electrical power of 800 KWe) and installed by the teams of Clarke Energy Tunisia, has reached today its 8950 hours of operation with a monthly availability of 98% We thank our customer Hikma Pharmaceuticals for their confidence in our know-how in energy efficiency and in our after-sales service that will accompany him throughout the life of his trigeneration plant. Learn more about...
-
AGR Fenlands Glasshouse 3D Walkthrough Videos
The AGR Fenland glasshouse project combines a 33MWth heat pump system with a combined heat and power (CHP) plant comprising three high-efficiency INNIO Jenbacher gas engines with CO2 recovery. The CHP plant consists of Jenbacher J416, J620 & J624 engines providing an electrical output of 9MWe, which will be used to power the glasshouse, the LED grow lights and various site auxiliaries. The waste heat generated from the engines is to be utilised as hot water which will be stored in two 6000m3 thermal stores...
-
Clarke Energy and INNIO Participate in PowerGen India 2022 Exhibition
Clarke Energy’s offices in India alongside INNIO Jenbacher participated in PowerGen India 2022 Exhibition, held from 12-14th October 2022. The event, which was held in Pragati Maidan, New Delhi, saw a huge number of entrepreneurs and corporates showing interest in our diesel displacement and hydrogen to power solutions using INNIO’s Jenbacher gas engine technology.
-
Clarke Energy and Jenbacher Increasing New Zealand’s Green Energy Using Biogas
Clarke Energy was recently involved in a project supplying EnviroWaste Services Limited with a fourth Jenbacher biogas engine, the Jenbacher J320. The installation of the fourth engine allows EnviroWaste to increase the utilisation of the biogas that is generated within the Hampton PARRC landfill. This reduces the carbon footprint and increases green energy supply across New Zealand’s power grid. EnviroWaste Services is a leading New Zealand based sustainable resource and waste recovery management...
-
Clarke Energy takes the lead with Jenbacher in Decarbonisation in the Oil and Gas Industry
Clarke Energy was recently awarded a contract to work on Santos’ A$220 million carbon capture and storage project (CCS) in Moomba, South Australia. Expected to be launched in 2024, the Moomba energy transition project will capture and geologically store 1.7 million tonnes of CO2 per year. The project is a global leader on reducing the cost of full lifecycle emissions compared to other CCS projects. It will utilise depleted geological oil and gas reservoirs, distinguishing it from other global CCS operations...
-
Jenbacher Engines Helping to Convert Landfill Biogas into Renewable Electricity
Clarke Energy continue to emerge as a leader in the renewable energy and biofuel sector. Working together with LMS Energy and the Brisbane City Council, Clarke Energy has supplied LMS Energy with a 1.1MW Jenbacher biogas engine which has been installed at the Rochedale landfill site in Brisbane. The new Jenbacher engine forms part of a total 7MW install that will generate approximately 18,250MWh of renewable energy per annum – enough electricity to power more than 3,300 Brisbane households. The engines are...
-
Trigeneration Plant Commissioned at MedOil in Tunisia
Clarke Energy have commissioned another new trigeneration project commissioned in Tunisia. Clarke Energy have installed a INNIO Jenbacher J612 containerised gas engine solution on behalf of our customer Poulina Group Holding at the production site MedOil. MedOil are one of the main producers of margarines, vegetable fats, vegetable oils and mayonnaise in Tunisia. We thank our customer Poulina Group Holding for their confidence in our know-how in energy efficiency. More details on our containerized gas engine...
-
Hybrid Energy Glasshouse Project Shortlisted for ADE Award
Clarke Energy’s hybrid energy project at AGR’s 217,000m² glasshouse and energy centre has been shortlisted for the ‘Integrated Energy Award’ at the ADE’s Decentralised Energy Awards 2022. The industry-leading awards show from the Association for Decentralised Energy (ADE) celebrates the people and projects that have developed the most innovative decentralised energy solutions designed around the needs of the user.? This year’s awards gala, sponsored by Clarke Energy will...
-
Clarke Energy’s Corporate Values in Action in the Local Community
Clarke Energy has been contracted to design, procure, and construct a new power generation facility for Alinta Energy: the Newman Power Station 2 (NPS2), Mt Whaleback Mine to expand their existing power station. The NPS2 project comprises 14 x Jenbacher J624 engines and associated balance of plant, for a total capacity of 61.67MWe. The engines will be installed in two separate power houses. The scope of work includes design, construction (civil, mechanical, and electrical), testing and commissioning the new...
-
The SEAI Energy Show 2022 - March 30-31 - RBS Dublin
Clarke Energy will be exhibiting at the SEAI Energy Show 2022 taking place on 30th- 31st March at the RDS in Dublin. The event is Ireland’s leading business to business sustainable energy event hosted by the Sustainable Energy Authority of Ireland (SEAI). Clarke Energy experts will be available on stand B9 to discuss our range of flexible energy systems which provide a variety of environmental benefits which can help reduce our customer’s carbon emissions and improve energy efficiency. Our offering...
-
Aspira Ltd Partners Clarke Energy to End Factory Downtime Due to Power Cuts
For Aspira Nigeria Ltd, which is part of Lee Group of Companies (second highest employer in Kano after the state government), its most daunting challenge in keeping its machines running used to be frequent power cuts until it turned to gas. Sami Jafaar, MD Aspira Nigeria Ltd in an interview with BusinessDay said that the problem with fluctuating diesel prices, the pollution problems that it brings including increased carbon emission and leaving the factory facility dirty forced him to look for alternatives. It...
-
Alinta Energy’s Newman Power Station Taking Shape with Clarke Energy
Clarke Energy is delivering the Engineering, Procurement and Construction (EPC) for the new gas fired power generation facility comprising of 14 INNIO Jenbacher J624 gas engines to improve the efficiency and flexibility of Alinta Energy’s gas-fired Newman Power Station in Western Australia’s Pilbara region. The additional 60MW of gas-fired generation will support Alinta Energy’s Pilbara operations, including the Chichester Solar Gas Hybrid project (comprising 60MW of solar photovoltaic generation...
-
INNIO Jenbacher and Clarke Energy Announce Expansion of Jenbacher Gas Engines Distribution to Independent and Merchant Power Producers in Indonesia
Clarke Energy can also offer Jenbacher natural gas engines with a “Ready for H2” option that allows the engines the capability to be readily converted from natural gas to up to 100% hydrogen operation. Clarke Energy now distributing Jenbacher gas engines across 28 countries Offerings to focus on natural gas applications To better serve the growing power and grid reliability needs in Indonesia, INNIO Jenbacher and Clarke Energy today announced that they have recently signed an agreement to...
-
INNIO Jenbacher dan Clarke Energy Mengumumkan Ekspansi Distribusi Mesin Gas Jenbacher ke Produsen Listrik Mandiri dan Produsen Listrik Penjual Indonesia
Tawaran akan berfokus pada penggunaan gas alam Clarke Energy kini menyalurkan mesin gas Jenbacher ke lebih dari 28 negara Agar dapat lebih mampu melayani peningkatan kebutuhan listrik dan keandalan jaringannya di Indonesia, INNIO Jenbacher dan Clarke Energy hari ini mengumumkan bahwa kedua pihak baru-baru ini menandatangani sebuah perjanjian yang memperluas wilayah distribusi Clarke Energy untuk mesin gas Jenbacher ke Indonesia dengan fokus pada Produsen Listrik Mandiri (Independent Power Producers/IPP) dan...
-
Knowledge is Power with Clarke Energy`s Technical Training
Clarke Energy is committed to delivering the highest quality products and solutions and best levels of after-sales support to our customers, including APA, one of Australia’s leading energy infrastructure businesses. We understand that the availability and reliability of power generating equipment is central to the efficient operation of an organisation’s plant and supports the highest levels of return on investment for our customers. For optimum operation and maintenance of equipment, you need a...
-
Major Scheduled Engine Overhaul Completed at Great Ormond Street Hospital, London
Clarke Energy’s service team have recently completed the scheduled 60,000 hour overhaul of an INNIO Jenbacher engine installed at Great Ormond Street Hospital (GOSH), London. The Jenbacher Type-4 engine, originally commissioned by Clarke Energy in 2015, is unusually positioned on the roof the building at the famous children’s hospital. As GOSH is located in a busy part of central London, road closures were required to remove the engine safely from the roof and return it to our Overhaul and Repair...
-
Clarke Energy Forges Powerful Alignment with Bioenergy Australia
Clarke Energy is now a proud member of Bioenergy Australia, the innovative organisation with the aim of accelerating Australia’s energy transformation to bio-based fuel, gas, heat and power. The collaboration is the ideal alignment of strengths and capability as Clarke Energy continues to develop and supply our factory-built, biogas packages that are essentially ‘plug and play’ across Australia and New Zealand, including most recently at Sydney Water’s Malabar Wastewater Treatment Plant. B...
-
PPIL Partners Clarke Energy to Increase Nigeria`s Exports of High-quality Plastic Products
Pentagon Plastic Industries Ltd (PPIL), a leading manufacturer of high-quality, cost-effective plastic housewares for home and industrial use, despite challenges, says it’s working to strengthen Nigeria’s position as a leading exporter of finished plastic products across the African continent. Established in 2002, Pentagon Plastic Industries Ltd (PPIL), which is part of the BL Chainrai Group, is a leading manufacturer of high-quality, cost-effective plastic housewares, garden furniture, and rigid...
-
EDL Picks Clarke Energy to Service 22 Jenbacher Gas Powered Generator Sets in Australia
Following a competitive tender process, Clarke Energy has been awarded the major undertaking of overhauling 22 INNIO Jenbacher gas powered gensets owned and operated by EDL across power stations spanning Queensland, New South Wales and Victoria. Clarke Energy technicians will undertake the 30,000-hour major services for thirteen 3MW Type-6 gensets and nine 1MW Type-3 gensets across four sites of this leading producer of sustainable distributed energy. The scope of work is to service these gensets in their...
-
Slama Frères and Clarke Energy Succeed in Cogeneration Challenge for 60,000 Hour Overhaul
1st major overhaul of an engine completed by Clarke Energy in Tunisia and starting a new cycle of 60,000 hours Slama Freres have made savings of more than 4 million Tunisian Dinars, after deduction of operating costs, and reduction of carbon emissions by more than 15 000 tonnes. Slama Frères, part of the Slama Group is based in the in the governorate of Manouba. The group was the first industrial company in Tunisia to opt for a cogeneration energy solution using INNIO Jenbacher gas engines. Slama...
-
Clarke Energy and INNIO Commission Second Jenbacher Gas Engine at Vitalait Plant in Tunisia
Clarke Energy has supplied “La Centrale Laitière de Mahdia – Vitalait” with a second INNIO Jenbacher engine to support its growing energy demand. The Vitalait cogeneration facility has increased its total electrical power to 4MWe Cogeneration reduces Vitalait’s energy costs by more than 2 million TND per year, after deduction of operating costs. Clarke Energy’s solution also enables Vitalait to reduce carbon emissions by more than 6,000 tonnes per year, thanks to high...
-
Clarke Energy chosen by Alinta Energy to expand their Newman Power Station
Clarke Energy to Engineer, Procure and Construct an expansion and upgrade of Alinta Energy’s gas-fired Newman Power Station in Western Australia’s Pilbara region Fourteen high-efficiency INNIO Jenbacher J624 gas engine generators to provide 60MWe of capacity Clarke Energy to design and construct two separate power houses and supply a 66/11kV export transformer complete with brownfield integration with existing 66kV substation The expansion will support Alinta’s operations in the Pilbara Clar...
-
Future Proofing with Unique, Cleaner Energy Power Generation Solutions
Clarke Energy’s Australian operation recently completed the commissioning of two additional 3MW gas generators for energy giant Santos at their Wilga Park Power station expansion project near Narrabri, in northwest New South Wales. This effectively future proofs the power station with a configuration of up to 12 INNIO Jenbacher 3MW gas engines installed across multiple stages. The two additional gas generators increases the capacity of the facility to 18MW , capable of powering around 23000 households from...
-
Clarke Energy partners with the UN Environment on District Energy in Cities Initiative in India
Clarke Energy recently partnered with the UN Environment to take part in their ‘Cooling Smart Cities: The Arrival of District Energy in India’ workshop held in Rajkot. The event discussed the activities of the UN Environment-led District Energy in Cities Initiative and its efforts to accelerate investments, raise awareness and unlock supportive policy frameworks for district energy systems in India. Clarke Energy reiterated its commitment in disseminating gas based trigeneration solutions using...
-
Clarke Energy at Power Nigeria 2017
Power Nigeria 2017 ‘Energising The Industry’ will take place from 5-7 September in Lagos at the Landmark Centre. Find Clarke Energy at stand 1.F02 Power Nigeria offers an essential platform for exhibitors to showcase the latest brands, products, technologies and innovations to a range of individuals from the Power and Energy industry. The 2016 edition witnessed unprecedented growth in participating companies and trade visitors, comprising of 85 exhibitors from 14 countries and dedicated pavilions...
-
Clarke Energy Participates in Pollutec 2016
Come and meet Clarke Energy at the Pollutec Exhibition from November 29th to December 2nd 2016 in Lyon Eurexpo. This is Pollutec’s 27th edition of the international exhibition for environmental equipmenttechnologies and services. Clarke Energy is the approved distributor and service provider for GE’s Jenbacher gas engines. We are committed to provide high quality facilities and offer a reliable services, as well as long-term support for the maintenance of the installations. Clarke Energy is a...
-
Data Centres Ireland 2016
Clarke Energy is exhibiting at DataCentres Ireland on Tuesday 8th and Wednesday 9th Novemeber 2016 at the Royal Dublin Society (RDS). The exhibition is in its fifth year and combines both a dedicated exhibition and a adjacent multi-streamed conference, giving attendees access to the latest in information, best practice, products, services and solutions. Minimisation of carbon emissions and ensuring environmental and financial stability is an important factor in the global data centre industry. Gas engine based...
-
GE Announces Clarke Energy as the Jenbacher, Waukesha and Diesel Engine Distributor in Papua New Guinea
Seeking to ensure regional customer sales and services excellence for its growing reciprocating engine technology portfolio in the southwestern Pacific, GE’s Distributed Power business (NYSE: GE) today announced it is establishing an agreement with Clarke Energy to serve as GE’s authorised distributor of the company’s reciprocating gas and diesel engines in Papua New Guinea. This agreement will cover Jenbacher and Waukesha products and genuine service parts, including Clarke Energy’s fully...
-
Clarke Energy Starts Operation in the Midwestern USA
Seeking to ensure regional customer sales and services excellence for its growing Jenbacher gas engine technology portfolio in the Midwestern United States, GE’s Distributed Power business (NYSE: GE) today announced it is establishing an agreement with Clarke Energy to serve as GE’s authorized distributor of Jenbacher gas engines in Iowa, Illinois, Indiana, Minnesota, Michigan and Wisconsin. This agreement will cover the entire range of Jenbacher products and genuine service parts, including Clarke...
-
Badsha Textiles Limited successfully operates GE’s Jenbacher gas engines since 2011
Badsha Textiles Ltd. one of the largest textiles factory in Bangladesh. Md. Badsha Miah is the Managing Director of Badsha Textiles Ltd., who is one of the CIP (Commercially Important Person) of the Bangladesh Government. Approximately 20,000+ employees work at this factory. Badsha Textiles Ltd. has been successfully operating GE’s Jenbacher gas engines since 2011. In 2011 they have purchased 2 of GE’s JGS 312 Jenbacher engines, each having capacity of 637kW of electrical power. In 2012 they have...
-
Israq Spinning Mills Captive Power Plants
Israq Spinning Mills Limited is a private limited company incorporated in Bangladesh in 2000. Israq Spinning Mills Limited is a 100% export oriented spinning mill. The daily production capacity of the company is roughly 17 MT. Israq Spinning Mills Ltd. mainly produces 20s-40s carded/combed yarn for export oriented knit ready-made garments. Israq Spinning Mills installed 2 of GE’s Jenbacher gensets in 2013, each having capacity of 1,063 kW of electrical power. In 2014, they have installed another 2 units of...
-
Suez and GE Monsal Opt for Low NOx Biogas Engines at Surrey Ecopark
Clarke Energy Supplying Two Low-NOx Jenbacher J416 Biogas Engines and GE supplying Monsal* Anaerobic Digestion System to SUEZ Recycling and Recovery UK for the Eco Park Surrey Project Digester Plant to Annually Process 40,000 Tonnes of Food Waste for Surrey County Council Biogas Created by the Digester System Will Generate Renewable Electricity and Heat by the Gas Engines Clarke Energy and GE (NYSE: GE) today announced that global engineering and construction company M+W Group has selected its Jenbacher gas...
-
Eiffage Selects Clarke Energy to provide GE Gas Engines for three new Greenhouses in France
Clarke Energy and GE’s Distributed Power business (NYSE: GE) today announced that it is supplying an additional three Jenbacher J624 gas engines to Eiffage, with an increased output of 4.5 megawatts (MW) (rather than the 4.4 MW provided by previous models) for three new greenhouse CHPplants in France. The higher output of the machines allows Eiffage’s customers to have more power in the same footprint. The units were sold by Clarke Energy, GE’s authorised distributor of Jenbacher gas engines. Eif...
-
The Energy Show 2016
Clarke Energy will be exhibiting at The Energy Show 2016 6th - 7th April 2016 organised by Sustainable Energy Authority of Ireland. It is located at the RDS in Ballsbridge, Dublin. The show is now in its sixteenth year and is the flagship event for professionals in the sustainable energy sector who come to showcase leading suppliers of energy efficient and renewable energy products and services from Ireland and Europe. Clarke Energy is due to celebrate ten years in Ireland this year which is a major milestone...
-
Clarke Energy a key Supplier in Northern Territory $75m Power Infrastructure Upgrade
Clarke Energy to Provide a Turnkey Solution with 10 of GE’s Jenbacher J624 Gas Engines for Territory Generation’s Owen Springs Power Station Upgrade to Provide More than 41 Megawatts of Electricity, Enough to Power the town of Alice Springs, and Will Help to Further Reduce Electricity Cost Projects are Part of an Electricity Cost-Reduction Drive, Spearheaded by the Northern Territory Government of Australia Clarke Energy and GE’s Distributed Power business (NYSE: GE) today announced that...
-
Clarke Energy at the African Mining Indaba
Clarke Energy is attending the African Mining Indaba from 8th - 11th February 2016 in Cape Town, and will be participating in the UK Pavilion. Clarke Energy will be there to discuss energy efficient and cost effective technologies for the power generation in mines. These include gas to power technology utilising GE`s Jenbacher gas engine portfolio. Using gas as a fuel source can deliver significant cost savings to other fuels that many other African industries are making use of. Where there is no access to...
-
Knowsley Councillors Visit Clarke Energy
Key representatives from Knowsley Council paid a visit to Clarke Energy on Thursday 22nd October 2015 to meet with our Chief Executive Officer Jamie Clarke and Alex Marshall Group Marketing and Compliance Manager. Knowsley Council are engaging with local industry and visiting various key businesses in the Knowsley area in order to delve into how we can create growth in the borough. This was the first time Councillor Andy Moorhead, Knowsley’s new council leader of four months had visited Clarke Energy’s...
-
Clarke Energy Breaks Duck at Diggers and Dealers 2015
Clarke Energy were proud sponsors of the Diggers and Dealers 2015 cocktail reception of the first day of the show. This was Clarke Energy’s first year’s serious involvement with the event, with a view to supplying the mining industry with cost effective, highly efficient power generation infrastructure. Clarke Energy’s Australian operations are based in Adelaide and Perth and team members from both offices joining the staffing of the exhibition stand during the show. In testament to the high...
-
Jenbacher Service Training Excellence
Clarke Energy’s GE-certified trainers in the UK have delivered over 50 Jenbacher gas engines training courses to more than 180 participants. Each training course has had nothing but good feedback from the attendees reflecting on the hard work from Clarke Energy staff. Clarke Energy is able to deliver the highest levels of Jenbacher service training across numerous countries. One of Clarke Energy`s employees Dave Johnson recently climbed another milestone in his career and passed his GE `train-the-trainer`...
-
GE Announces Clarke Energy Cameroon Gas Engines Distributor
Sales and Services Agreement for GE’s Growing Gas Engines Presence in Africa Clarke Energy to Enhance Local Service Excellence for GE’s Engine Customers Initiative Supports GE and Clarke’s Strategy for Meeting Africa’s Demand for Distributed Power Seeking to ensure regional customer sales and services excellence for its growing gas engine technology portfolio in sub-Saharan Africa, GE’s Distributed Power business (NYSE: GE) today announced it has signed an agreement in Cameroon...
-
Eurombah project achieves significant safety milestone
Clarke Energy designed Eurombah Creek Power Station (located in South West Queensland, approximately 403 kms from Brisbane) is a 27MW gas powered power station consisting of 9 x 620 Jenbacher reciprocating engines. These engines are built by GE in Austria and are running off 98% methane from coal seam gas reserves on a large live gathering gas network situated in the Surat Basin in Queensland. The power generated will be used in a gas processing facility to compress the gas and pump it to Gladstone where it will...
-
Solar Shortfall Plugged by Gas and Tomatoes
Much of Europe including the United Kingdom, France and Ireland will be plunged into darkness on Friday as a solar eclipse occurs. This rare phenomenon will pose significant challenges to Europe’s power generation network. As the moon obscures the sun’s rays from hitting the earth, this will also reduce the light available to solar panels by a significant amount. The electricity generated from solar panels is expected to drop by up to 75%. Germany faces the biggest short-fall in power generation...
-
Tanzania Energy Efficiency Workshop
On the 28th of January 2015 Clarke Energy worked with the British High Commission and UK Trade and Investment in Tanzania to deliver a workshop on energy efficiency in Dar es Salaam at the Hilton Doubletree Oyster Bay. The event was attended by a cross section of the Tanzanian business community and consisted of presentations by: Hugh Richmond, Business Development Director, Clarke Energy – Introduction to Clarke Energy Oluwatoyin Abegunde and Carole Koech GE – GE reciprocating engine products...
-
Vitalait Plant Opened by UK Ambassador & Tunisian Energy Minister
Vitalait’s cogeneration facility was opened on the 6th of December 2014 by the British Ambassador to Tunisia HMA Hamish Cowell, Tunisian Minister of Industry and Energy, Mr Kamel Ben Naceur, Mahdia Governor Mr M. Mohamed Najem Gharsalli and the Chief Executive Officer of Vitalait Mr Ali Klibi. Vitalait is a well-known household name in Tunisia, processing milk and dairy products. Vitalait’s factory is located in Mahdia, 220 kilometres south of Tunis, the Tunisian capital city. Vitalait’s...
-
India – Industrial growth through cogeneration
Indian woman in warehouse The surge in investor’s confidence since the Modi-led government took centre stage shows optimism of the new government towards trade and aspiration to improve the macro indicators. Largely attributed to Modi’s ‘Make in India’ campaign, the initiative is of due importance to increase India’s economic growth. But, can an efficient scale of production be met and be sustainable? Can the slogan ‘zero defect and zero effect’ be conjointly accomplished...
-
Mace selects Clarke Energy for Nova Victoria Development
International consultancy and construction company Mace has selected U.K.-based distributed power developer Clarke Energy to supply two Jenbacher J420 natural gas-fuelled engines from GE’s Distributed Power business (NYSE: GE). The engines will provide environmentally friendlier, more sustainable power and heat for the first phase of the £380 million Nova, Victoria, redevelopment project, an area of London previously known as Victoria Circle. Land Securities are transforming the area by providing new...
-
Clarke Energy secures first sale in Algeria with PlastPaper
Clarke Energy has signed its first deal in Algeria at PlastPaper’s industrial plastics facility in Oran. Clarke Energy signs deal to install a captive power plant at PlastPaper’s industrial plastic goods manufacturing facility in Oran Deal represent first megawatt of GE’s Jenbacher gas engine power plants for Clarke Energy in the country Plastpaper is installing the gas engine to ensure the factory has a more reliable supply of electricity and to prevent grid disturbances from affecting the...
-
Gas Engines for Independent Power Producers
Independent Power Producers (IPPs) are non-utility generators (NUG) that are typically not owned by the national electricity company or public utility. IPPs generate electricity and sometimes heat (via cogeneration) for sale to a third party. This third party could be the national electricity company, or may be via private wires to a specified company and is typically in grid parallel mode. Investors in IPPs need to ensure security of revenues and fuel supplies. This may be achieved through a number of mechanisms...
Related articles
-
Medoil Improves Competitiveness and Commitment to Sustainability With Cogeneration - Case Study
Medoil, part of Poulina Group, are a leading manufacturer specializing in production of margarine, vegetable fats, table oils, mayonnaise, and sauces. The company was facing mounting energy ...
-
Eramet Norway Launches Pilot Plant Utilising Furnace Gas and Hydrogen - Case Study
Furnace gas power plant supported by Enova’s Industrial Pilot ProgramRecovery and utilisation of furnace gas from ferromanganese processing plant (previously flared)Supporting Eramet’s ...
-
Pulp and Paper Factory S.A. Choose Clarke Energy in Romania
Combinatul de Celuloza si Hârtie S.A (Pulp and Paper Factory) in Romania, have chosen Clarke Energy to install a combined heat and power (CHP) plant to optimise the utility costs ...
-
Three Turnkey CHP Plants Delivered for Amiens Energies - Case Study
Amiens Energies is the public service delegate for the distribution and production of heat for the city of Amiens. Its purpose is to meet the heating and domestic hot water needs in ...
-
Revico Energies Vertes Utilising Biogas from Cognac Distillation - Case Study
Since 1970, Revico and its subsidiary Revico Energies Vertes have been utilising the by-products of the Cognac sector. Located in Saint-Laurent-de-Cognac (Charente), the company specialises ...
-
Tosett Agro Industries in Nigeria Records 70% Savings Switching from Diesel to Gas - Case Study
Tosett Agro Industries Ltd, a leading industrial firm says it has seen energy costs fall by 70 percent and lower carbon emissions from its operations following its decision to switch from diesel ...
-
Clarke Energy on the Move with Lonsdale Power Station
Iberdrola Australia have appointed Clarke Energy as the main contractor to oversee and manage the relocation of a 120MW power station and associated plant from Lonsdale, in Adelaide’s ...
-
Clarke Energy Deliver Full Turnkey Hydrogen Ready CHP Plant to Sterling Pharma Solutions - Case Study
Sterling Pharma Solutions is a global pharmaceutical contract development and manufacturing organisation (CDMO). As part of its sustainability strategy, Sterling partnered with Clarke Energy to ...
-
Sydney Water Plugs in Additional Cogeneration Solutions from Clarke Energy
Sydney Water has plugged in additional expertise and cogeneration power from Clarke Energy and D4C, contracting a further two INNIO Jenbacher J420, 1.5MW biogas to energy generating ...
-
Clarke Energy and INNIO Jenbacher Powering New Pasta Factory in Douala, Cameroon - Case Study
Douala, Cameroon, May 2021, Clarke Energy and INNIO Jenbacher are delighted to announce the successful commissioning of a high-efficiency INNIO Jenbacher gas engine to power a new Pasta ...
-
Clarke Energy and INNIO Delivering Flexible Generation to Nova Power & Gas in Romania - Case Study
Clarke Energy supplies Nova Power & Gases’ gas-fuelled peaking station with four INNIO Jenbacher J620 gas engines.The project will improve efficiency and stability of power to the ...
-
CSM GIAS Choose Clarke Energy and INNIO to Deliver Turnkey Cogeneration Plant - Case Study
CSM GIAS cogeneration facility will generate 1.2 MWe with an overall energy efficiency of 80%Electricity production has been operational since Q4 2020The project guarantees savings of 55% on the ...
-
SAS CMV Biogas Agricultural Methanisation, France - Case Study
In September 2015, 4 farms located in the Southern High Marned came together to operate a collective agricultural methanisation unit in Chalancey. Together, they combined to create the ...
-
55GWh of Renewable Power Generated at Kodungaiyur Sewage Treatment Plant - Case Study
The single Jenbacher JGS 320 gas engine has completed 100,000 hours of operation, generating 55GWh of renewable power since commissioning in 2006.Kodungaiyur plant has the capacity to treat 110 ...
-
Major 60,000 Hour Engine Overhaul Completed at Nejma Huile, Tunisia - Case Study
Slama Frères parent company of the SLAMA Group is a specialist in the refining and conditioning of oils under the brand “Nejma”. The group was the first industrialist in ...
-
Viyellatax Cogeneration Plant, Bangladesh - Case Study
Viyellatax Limited is the composite knit apparel and textile manufacturing business unit of Viyellatax Group. It started its operations in 1996. The company is comprised of design and product ...
-
Orbost Gas Plant Upgrade, Australia - Case Study
Clarke Energy has been engaged by APA Group to provide engineering design and supply of four of GE’s high efficiency Jenbacher 420 1.498 MWe containerised gas engines ...
-
St. Cloud Wastewater Install Biogas and Natural Gas Engine, USA - Case Study
In 2016, St. Cloud Wastewater Treatment Facility selected Jenbacheras the blended biogas and natural gas engine of choice for their new renewable energy plant. For most cities, ...
-
UK’s First Military base to run almost completely on renewable energy - Case Study
Home to the frontline squadrons of the RAF’s elite Tornado Force and the F-35 Lightning, multi-role, stealth fighter, RAF Marham, is the UK’s first military base to ...
-
La Gabarre landfill gas power plant, Guadeloupe - Case Study
Clarke Energy has completed a project to supply of 2 of GE’s JMS 416 containerised gas engines, landfill gas treatment including blowers, chillers and activated carbon filters, ...
-
Plastic Omnium, BasePower, CCHP plant, UK - Case Study
Plastic Omnium Automotive Ltd (POA) is a world leader in the design and manufacture of external automotive body parts. The division serves 15% of the global market for leading car manufacturers ...
-
VIYELLATEX improves factory efficiency thanks to cogeneration with gas engines
VIYELLATEX Limited is the composite knit apparel and textile manufacturing business unit of VIYELLATEX group. It started its operations in 1996. The company is comprised of design and product ...
-
Badsha Textiles captive power plants, Bangladesh - Case Study
Badsha Textiles Ltd. one of the largest textiles factory in Bangladesh. Md. Badsha Miah is the Managing Director of Badsha Textiles Ltd., who is one of the CIP (Commercially Important Person) of the ...
-
Sabar Dairy CHP - Case Study
Sabarkantha District Co-operative Milk Producers Union started in 1964, and has progressed to a fully integrated milk processing organisation involved in reception, pasteurisation, condensing, ...
-
Maize Products Biogas CHP Gujarat - Case Study
With a legacy of over seven decades, Maize Products has exemplified corn milling from a modest 1 tonne/day of crushing in the year 1941 to a crushing of 650 tonnes/day today. Honoured with the ...
-
Idex Environnement’s Biogas plant at Amiens - Case Study
The Anaerobic Digestion (AD) plant in Amiens is operated by Idex Environment. The biogas is derived from the municipal solid waste (MSW) originating from the local area. Clarke Energy has delivered a ...
-
Boston Scientific, Clonmel, Northern Ireland CHP Project - Case Study
With more than 25,000 employees worldwide, Boston Scientific is a true giant of the medical industry. They are an industry leader in less invasive surgical technologies. As a group, they manufacture ...
Customer reviews
No reviews were found for GE Jenbacher - Model Type-4 - Gas Engine. Be the first to review!