UzelacGreen Biomass Suspension Burner

SHARE

The burner is fully fabricated in the factory, including the refractory and typically can be fully erected on-site in three working days.

Most popular related searches
  • Proven to out perform all ‘bed’ and ‘pile’ type burner designs
  • Complete solid fuel suspension within a powerful ‘cyclone’ of combustion
  • Makes varied in-coming fuel solids moisture content a non-issue
  • Handles fuel load fluctuations and varied in-coming size and characteristics

The Burner consists of the following:

  • Lower Burner Assembly (LBA), with mounted Green-Fire Burner, Full Factory Installed and fully-cured refractory lining, consisting of 4” castable insulating refractory, and 9” high-temperature furnace refractory.
  • Upper Burner Assembly (UBA), Full Factory Installed and fully-cured refractory lining, consisting of 4” castable insulating refractory, and 9” high-temperature furnace refractory. This unit also contains the refractory choke ring for furnace retention and burn-chamber encapsulation.
  • Recycle Burner Assembly (RBA), for 99.9% VOC Destruction.

The intent would be to recycle up to 50% of the dryer exhaust back to the Recycle Burner Assembly for a 99.9% VOC destruction!