Lahmeyer - Hydropower Plants
The history of water power utilization may be traced back to more than 3,500 years ago. Due to its environmental compatibility and reliability, this inexhaustible power source remains very promising for the future. Hydroelectric power plants require a wide variety of specialist planning, design and supervision services which Lahmeyer Hydroprojekt can provide out of their own resources and in co-operation with its parent company Lahmeyer International In addition to run-off river power plants and storage power plants, another technical challenge is to add on generation facilities to existing installations in order to allow hydroelectric power generation e. g. in the intake facilities of dam reservoirs.
References (selection)
References (selection)
- Paravani Hydropower Project (Georgia): Construction of a run-of-river plant with an installed capacity of 87 MW
- Yedigöl and Aksu HPPs (Turkey): Run-off-river power plants with regulators and sedimentation basins, 4 and 6 km long pressure tunnels, open air power houses with 2 Pelton turbines, installed capacity of 22 and 29 MW
- Alara Hydroelectric Project (Turkey): Hydroelectric power scheme consisting of a 120 m high RCC Dam, open air power house with Francis turbines, and four run-off-river power plants, total installed capacity 140 MW
- 'Neue Mühle I/II' hydroelectric power plants (Germany): Construction of plant 'Neue Mühle II' and optimization of existing plant 'Neue Mühle I'
Customer reviews
No reviews were found for Lahmeyer - Hydropower Plants. Be the first to review!