Model HPK-RA - Heating Containers
From Heating Containers
Electrical installation. Stainless steel chimney to suit boiler. Safety devices. Installation (flow & return). Fuel store fill and vent pipes & couplings. All doors and access hatches included. Ventilation as required. Single container or two storey container. Storage space 20 - 45 m3
Advantages
- Forward feed firing for drying, gasification, and combustion of the fuels as well as ash removal from the combustion chamber
- Grate sledge with maintenance-free sliding guides for the moving grate bars individually mounted for assembly and disassembly at service as required
- The primary and secondary air are regulated by means of individual air dampers. Output regulation via flue gas temperature, lambda reading, combustion chambertemperature and boiler temperature.
- Combustion chamber door with double hinges in the front wall of the combustion chamberfor inspection and service as well as service door
- below the grate.
- Ceramic lining of high heat-resistant concrete.
- De-ashing at the end of the grate, combined with automatic ash removal
- IBS-tested cell wheel
Customer reviews
No reviews were found for Model HPK-RA - Heating Containers. Be the first to review!