- Home
- Companies
- Jiangsu Huade Hydrogen Energy ...
- Products
- Model H2ES-5 - Natural-gas-reformed ...
Model H2ES-5 - Natural-gas-reformed Hydrogen Fuel Cell CHP System
H2ES-5 is designed for residential use. It consumes natural gas(converted to be 75%-78% purity hydrogen) and generates electricity and useful heat simultaneously. With 1.5Nm3 natural gas, it can generate 5kWh power and 7.5kWh heat per hour. The overall efficiency is up to 93.5% and can reduce carbon emmission by 30%. It is a highly efficient solution to reducing energy bills and cutting carbon footprint. The produced electricity can be used on-site to power a range of appliances, while any excess electricity can be exported to the grid. The generated heat is output in the form of hot water. It is ideal for use in a wide range of environments, such as multi-family houses, apartments, hotels, resort buildings, shopping malls, office buildings, etc.
H2ES-5 has been updated to 3rd generation. The 3rd generation is equipped with a touch screen and the inner structure has been optimized.
H2ES-5 natural-gas-reformed hydrogen fuel cell system is composed of 6 parts:
-
reformer module
-
fuel cell stack module
-
power control module
-
heat management module
-
base frame
-
control system
-
High energy conversion efficiency: Up to 40% electric efficiency and up to 93.5% overall efficiency, much higher than other types of power generation technologies nor CHP technologies
-
Saving electricity bills: It generates 5KWh electricity per hour which can save much electricity bills
-
Flexible load regulation: 50%-100% adjustable working range, can be coupled with gas boiler
-
Low noise: it is very quiet when running
-
Long lifetime: the equipment is designed for 40000h lifetime
The maintenance costs will be charged at a fixed rate every year. There are no more hidden costs!
For maintenance, our distributors will offer a 10-year maintenance contract. This maintenance contract is necessary for the funding via KfW.
The system can be maintained remotely via a network connection. So minor faults can be quickly rectified without the need for a technician to be on site. In addition, the system must be checked every 12 months. For this purpose, the system can`t work for 1-2 days and all necessary tests will be conducted.