Fred. Olsen 1848

Offshore Wind Turbine Mobile Port Installation Solution

SHARE
Fred. Olsen 1848 has developed an innovative Mobile Port Solution tailored for the Floating Offshore Wind Industry, offering an offshore installation without the need for large-scale land infrastructure. By utilizing jack-up installation vessels in sheltered waters, this solution integrates wind turbines with floating foundation structures, overcoming common industry constraints like limited port facilities and reliance on land-based cranes. The agile and flexible nature of this solution supports commercial-scale deployments while reducing capital expenditures by efficiently utilizing existing infrastructure assets. Designed to work with a wide range of semi-submersible floating platforms, the solution enables the use of local ports for pre-assembly and streamlines installation logistics. This method also involves employing and training local labor forces for various operations, ensuring a skilled workforce is available to support this innovative installation process. Fred. Olsen 1848's approach addresses the industry's key challenges and aids in the rapid deployment and maturation of offshore wind technology.
Most popular related searches

An installation solution with an nearshore port that utilizes ready to go technology to perform the wind turbine integration in a safe an efficient manner.

This allows for flexibility to overcome some of the critical constraints we see today in the Floating Offshore Wind Industry.

Fred. Olsen 1848 holds the patent-pending Mobile Port Solution, which is an offshore installation solution that utilizes ‘ready-to-go technology’ through the deployment of jack-up installation vessels in sheltered waters for integration of wind turbines to floating foundation structures.

The Mobile Port Solution allows for instant commercial scale of floating offshore wind installations.

We are solving critical constraints, reducing CAPEX and allowing for optimal utilization of existing infrastructure.

Thereby we are creating an immediate solution for the progression and rapid deployment of floating offshore wind.

The Mobile Port Solution builds upon proven and safe methods of operations refined over many years of turbine installation for bottom fixed offshore.

The solution is adjustable to any known semi-submersible floating design & turbine platform in the market.

Our development approach is driven by identifying underlying and fundamental issues and challenges that are critical for maturing the offshore wind industry.

Based on our findings and analyses, we create solutions nourishing on our core experience and with input from our technical expertise. We aim to integrate local competencies and we boldly pursue developing solutions that set new standards for the industry as we remain focused on solving the most significant constraints, i.e.:

Lack of suitable port infrastructure
Utilise existing ports for pre-assembly to re-locate all installation activities to the offshore Mobile Port location.

Limitations of a land-based crane for turbine integration activities
Deployment of existing, jack-up installation vessels for wind turbine installations and integration of floating structures to ensure fast and lean processes.

Fabrication lead times and logistics
Assembly of floaters near the wet storage yields higher efficiency and reduces project costs.

Floating technology designs
The Mobile Port can be located in sheltered waters with sufficient draft in proximity to wet storage for an efficient campaign.

Costly O&M solution for floating technology
FO1848 is developing O&M solutions allowing routine maintenance and key component replacements to be efficiently executed at the offshore site.

Need for a skilled and trained workforce
FO1848 aim to employ local workslabour for pre-assembly at port, logistics and installation at the Mobile Port and to train such workforce to make this a reality.